Most viewed - Pilbara negative and digital Albums - Iron Ore |

170728 0967899 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

170728 0969099 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

171121 096099 viewsBarker Siding, FMG's ballast loading single ended siding, stabled are the Loram MPC 2 grinder and the FMG ballast waggon set. 21st November 2017.
|
|

241-1899 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side view with hood door open, Goldsworthy Joint Venture signage. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
|
|

243-0299 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2 stands in the morning sunlight. August 2003.
|
|

243-1299 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

243-1499 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080116 138499 viewsChapman Siding, view of the New York Air Brake module, on the left is the EP60VV vent valve, then the CCD waggon control device and then the manual release.
|
|

080304 218099 viewsThomas Yard, down the rail welding end, side view of slave waggon 1341, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-2599 viewsCape Lambert, Robe River locomotive 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|

247-1799 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

268-3399 viewsAt the 39 km detection site, while the party learn about the operation of the detection equipment in the background, two of ALSTOM's 'hardest' workers, Peter Dickens and Peter Collins give a wave. Friday 12th of April 2002.
|
|

224-2798 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
|
|

225-0298 viewsBing siding at the 17.5 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, seen here sitting at BNN 6 signal awaiting a path, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.
|
|

225-0598 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie as it passes Goninan rebuild CM40-8M GE unit 5669. GeoData.
|
|

225-1198 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
|
|

226-2598 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

227-0498 viewsNelson Point, looking across with Anderson Point on the left and Stanley Point on the right, Boodarie workshop can be made out with a train in front of it. Today this view is very different!! GeoData.
|
|

227-2998 views30 km area, mid-train lead remote 5641 'Indee' serial 8281-06/92-130 a Goninan CM40-8M GE rebuild. GeoData.
|
|

228-1198 viewsYandi Two mobile machine parking bay, a new water cart for Henry Walker, operator of the BHP owned mine, WC201 is based on a Caterpillar 777B truck chassis.
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
108 |  |
 |
 |
 |
 |
 |
 |
|