Most viewed - Pilbara negative and digital Albums - Iron Ore |

080116 1372155 viewsChapman Siding 69 km, FMG master or control waggon 2396 tare 22.9 tonnes with bar coupling for the 'married' pair showing the train pipe, waggon control pipe and electrical jumper. Built by China Southern or CSR at their the Zhuzhou Rolling Stock Works in China in 2007, stands on the passing track. 16th January 2008.
|
|

080124 1625155 viewsChapman Siding, new FMG ore waggon pair 1255 slave and 2256 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080124 1628155 viewsChapman Siding, new FMG ore waggon pairs 1179 slave and 2180 control and 1259 slave and 2260 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

080304 2210155 viewsThomas Yard, down the rail welding end, side view of control waggon 2584, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

248-22155 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On N2 is a cab comparison between AE Goodwin built ALCo M636 unit 9412 serial G-6060-3 from December 1971 and originally numbered 262.003 during construction and then 1712 on MLW Dofasco bogies with C636R units 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987 riding on the ALCo Hi-Ad bogie. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Behind it on N3 is 9413. Approximate location. 24th April 2004.
|
|

210510 1118155 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTS type straddle crane carrying rail waggon RTS 002 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

040718 151441155 viewsNelson Point, Car Dumper 3, BHP ore waggon 1918, originally built by Comeng WA in 1975 as part of a batch of one hundred and seventy-five waggons. Seen here with replacement sides out of 3CR12Ti type steel to the then current Goninan style. 18th of July 2004.
|
|

110620 1965r155 viewsWalla Siding, comparison between two BHP ore waggons loaded with Yandi fines of the Golynx design type, 8410 was built in November 2001 for bottom discharge on the Goldsworthy system with serial number 950088-340, while 6834 was built in 2008. The burn or weld marks are still visible on 8410 from when it was in GML service, now converted for rotary service, noticed the filled in end and the angle section along the top edge for support. 20th of June 2011.
|
|

224-29154 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

227-23154 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
|
|

230-05154 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
|
|

231-27154 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

235-05154 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

236-36154 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6071 'Chichester' serial 51063 sits out the front with new windscreen protectors or 'blinkers' fitted, cab side and bogie view.
|
|

040806 091334154 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040806 092730154 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
|
|

040815 164800154 viewsNelson Point, CFCLA ballast waggon CHQY type 730 having just been offloaded from road transport and placed on rail, view from handbrake end.
|
|

050412 0759154 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 520.
|
|

050412 0767154 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

050414 0943154 viewsFlash Butt yard, Comeng NSW built 82 kilolitre water tank waggon 0001, one of two such tank waggons built in November 1970.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
116 |  |
 |
 |
 |
 |
 |
 |
|