Most viewed - Pilbara negative and digital Albums - Iron Ore |

267-20385 viewsGoldsworthy Junction, CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 leads the Sundowner Special on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in the middle and sister CM40-8M 5653 bringing up the rear.
This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 are holding track.
They can be seen behind the signal sitting on the transfer road.
Friday 12th of April 2002.
|
|

269-10385 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

040804 155856385 viewsNelson Point, empty BHP ore waggon 1354 is a Comeng WA build from a batch of two hundred and twenty-six in 1973/74. Waggon has been resheeted with new side walls. 4th of August 2004.
|
|

240701 2730385 viewsPilbara Railways Historical Society, passenger carriage 'Fortescue' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2141. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

220-25384 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 a Goninan WA ALCo rebuild C36-7M model and one each of the second-hand waggons purchased from Phelps Dodge Copper Mine, the ribbed unit 352 is a Portec USA build while the smooth sided 300 waggon is a Gunderson USA build.
|
|

225-20384 viewsAt the 24.1 km grade crossing on the BHP Newman line, General Electric AC6000 model unit 6074 serial 51066 built at GE Erie leads the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
|
|

227-18384 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

228-29384 viewsYandi Two load-out tunnel, view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

228-30384 viewsYandi Two load-out tunnel, trailing view of empty train about to enter for loading behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

230-18384 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|

230-33384 viewsYandi Two balloon loop, Goninan new build ore car 4239, build date of June 1997 from the original United Goninan WA order for 126 units with a tapered floor. Tare weight of 23.3 tonnes, loaded with Yandi Fines ore. Geodata -22.718338, 119.039909 .
|
|

232-19384 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.
|
|

232-24384 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|

233-05384 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
|
|

233-10384 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

040806 102928384 viewsFlash Butt yard, rear view of stored out of service LocoTrol waggon 2626 showing number board and the short hood end.
|
|

050518 2072384 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
|
|

050518 2128384 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows bogie detail, AT & SF CS-3000 bogie casting with CFCLA id of CQFE 093
|
|

050518 2132384 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761, shows bogie detail, ASF Ride Control bogie with CFCLA id of CQFE 111.
|
|

050518 2166384 viewsBing Siding. Side view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
116 |  |
 |
 |
 |
 |
 |
 |
|