Most viewed - Pilbara negative and digital Albums - Iron Ore |

1050 001620 viewsWelshpool, Goninan Open Day 27th August, 1988. Brand new GE CM39-8 locomotive 5633 serial 5831-12 / 88-082 is only in the early stages of construction for Mt Newman Mining.
Jim Bisdee photo.
|
|

040801 144228619 viewsWalla Siding, Goninan built, Lynx Engineering designed ore waggon 4403 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, asset number 203510 with serial 950124-004 and build date 02/2004. 1st August 2004.
|
|

3079 roster rhs 040627 134646619 viewsNelson Point BHP Billiton SD40 unit 3079 serial 31542 originally Southern Pacific SD40 SP 8461 and still in former owner IC&E blue and yellow has been fitted with some crew amenities like cab air-con, radios and microwave to allow it to operate as a yard pilot, seen here in the yard on the 27th of June 2004.
|
|

242-08617 viewsNelson Point, BHP Goninan GE rebuild C36-7M unit 5508 serial 4839-04 / 87-073 about to be trucked to United Goninan Perth for eventual overhaul and repainting into the Pilbara Rail livery and leased to Pilbara Rail re-numbered 5052 as a shunt unit at Dampier. May 2002.
|
|

223-36616 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
|
|

160128 00404616 viewsWedgefield, Sims Metal Yard, front view of Goninan rebuilt GE model CM40-8M 5660 serial 8412-05, builders no. 94-151.
|
|

150505 7979610 viewsFMG Solomon Line, waggon 4006, tare weight of 22 tonnes, built in 2009 by CSR Yangtze Rolling Stock Co. Ltd, loaded with fines ore. Geodata: -22.0187350 118.5850917 .
|
|

19794610 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 2 end. Sept 2003.
Jim Bisdee photo.
|
|

242-22609 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
|
|

150505 7936606 viewsFMG Solomon Line, looking east across valley at massive earth fill for rail line. Geodata: -22.0351433 118.7568750 .
|
|

196-06604 viewsYandi Two, BHP Iron Ore 5631 'Apollo' serial 5831-10 / 88-080 originally built new by Goninan as a GE CM39-8 in 1988. Drivers side cab view shows hand brake chain and bogie. May 1998.
|
|

203-11604 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.
|
|

150523 8218604 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0021, total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

040616 162210604 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

203-08603 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

150505 8001603 viewsFMG Solomon Line, zoom view looking east from west of Bow Siding, loop can be seen right back to east end through cutting, an empty train in the arvo will work here! Geodata: -22.0256300 118.4896100 .
|
|

1061 001603 viewsWelshpool, Goninan, Mt Newman Mining's AE Goodwin built ALCo C636 model 5465 serial G6041-1 sits on a road transport float out the front of the workshops, this unit went on to be rebuilt into a GE C36-7M unit 5512. December 1987.
Jim Bisdee photo.
|
|

041014 122512603 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th October 2004.
|
|

180616 1800r602 viewsEmu Siding, a rare sight in the Pilbara, a Rio Tinto pink iron ore waggon pair to raise awareness for breast cancer. Chinese built Bradken B type waggon pair 20475 control and 25475 slave with a build date of July 2014, still holding colour pretty well in June 2018. GeoData.
|
|

196-03600 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C unit 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
12 |  |
 |
 |
 |
 |
 |
 |
|