Most viewed - Pilbara negative and digital Albums - Iron Ore |

6208 Comeng WA 051001 5712415 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, builders plate, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

6208 Comeng WA 051001 5713415 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #23, 6208, builders plate, bogie and ladder, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

6002 Tomlinson Steel 060429 3735415 viewsFlash Butt yard, Pony re-laying waggon, 6002 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
|
|

0701 Difco USA 060501 3899415 viewsTabba Siding, built by Difco USA in 1971 for Mt Newman Mining in a group of four, 701 was the class leader of the long side dump waggons.
|
|

8500 Tomlinson Steel 060714 6895415 viewsGarden Siding, flat waggon 8500, originally built by Tomlinson Steel WA for Goldsworthy Mining as one of six 55 ton flat waggons built in 1966, and later modified by BHP to increase its capacity, bogie and handbrake detail.
|
|

050801 4743415 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|

6021 Gemco WA 100717 0669415 viewsFlash Butt yard, new rail stock carrier waggon 6021, built by Gemco Rail in 2010 riding on Barber bogies.
|
|

0018 Comeng WA 110411 09999415 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

0014 Comeng WA 110411 10001415 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

0016 Comeng WA 150314 7743415 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0016 from 1974-5, one of six such tank waggons.
|
|

060715 6950415 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.
|
|

241-35415 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

01167 080304 2176415 viewsThomas Yard, down the rail welding end, side view of slave waggon 1167, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

253-31415 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
|
|

267-08415 viewsGoldsworthy Junction, BHP's 1230 empty departure behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial number 51068 leads CM40-8MEFI 5669 on the point with two CM40-8M mid-train units an 208 waggons powers along the Newman mainline with the Goldsworthy line to Yarrie curving away directly in front of 6076. 1247 hrs 12th of April 2002.
|
|

4508 Transfield 110620 2320415 viewsWalla, loaded BHP ore waggon 4508, one of eighteen built by Transfield WA in 1976 with a tapered floor. June 20, 2011.
|
|

221-24414 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.
|
|

224-28414 viewsBing siding, mid-train remote units Goninan rebuild CM40-8M GE units 5638 'Mallina' serial 8281-02 / 92-127 leads sister unit 5669. GeoData.
|
|

225-07414 viewsBing siding, the afternoon departure for Yandi mine heads south past the ballast consist, behind the standard double General Electric AC6000 units with GE Erie built 6075 serial 51067 second unit to lead sister unit 6074 with another AC6000 unit mid-train. This was before the units were named. GeoData.
|
|

226-03414 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
120 |  |
 |
 |
 |
 |
 |
 |
|