Most viewed - Pilbara negative and digital Albums - Iron Ore |

170728 09689382 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
|
|

241-12382 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs. June 2002.
|
|

243-18382 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2182382 viewsThomas Yard, down the rail welding end, side view of slave waggon 1337, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-28382 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
|
|

243-35382 viewsNelson Point departure yard, hood view of BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

247-30382 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8. Location is here.22nd May 2002.
|
|

247-36382 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

221-26381 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

224-30381 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie departs the loop south with sister unit 6073. GeoData.
|
|

228-25381 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
|
|

229-01381 viewsYandi Two balloon switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. GeoData.
|
|

229-05381 viewsYandi Two balloon switch looking east with an empty BHP train heading for the loadout with mid-train remote units Goninan rebuild CM40-8M GE units 5660 'Kure' serial 8412-05 / 94-151 leading sister unit 5657, grade crossing is the YT 311.5 km. GeoData.
|
|

230-17381 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 leads a loading train 1.2 km/h. The ore stockpile and pedestal stacker are visible. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
|
|

235-12381 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 passes out the other side of the loadout tunnel as loading has commenced, the dust extraction equipment and retaining wall culvert frame the loco.
|
|

236-29381 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

040814 092225381 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, handbrake end view.
|
|

050518 2127381 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 750, shows bogie detail, AT & SF CS-3000 bogie casting with CFCLA id of CQFE 094
|
|

050704 3988381 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

051001 5624381 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, pushed into an earth bund with 55 tonne flat waggon 6705 behind, view from handbrake end.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
121 |  |
 |
 |
 |
 |
 |
 |
|