Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
080304_2188.jpg
080304 218894 viewsThomas Yard, down the rail welding end, side view of slave waggon 1327, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2190.jpg
080304 219094 viewsThomas Yard, down the rail welding end, side view of slave waggon 1335, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
110620_2275.jpg
110620 227594 viewsChapman, FMG TK type fuel tank waggon TK 06 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
110620_2279.jpg
110620 227994 viewsChapman, FMG TK type fuel tank waggon TK 07 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
224-21.jpg
224-2193 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
224-24.jpg
224-2493 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
225-12.jpg
225-1293 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
225-29.jpg
225-2993 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.
226-23.jpg
226-2393 viewsShaw siding at the 219 km a loaded train with standard double CM40-8M power blasts along the mainline with the rear portion still on a .55 percent grade as it passes the Speno rail grinder in the back track. GeoData.
227-19.jpg
227-1993 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
227-30.jpg
227-3093 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
227-32.jpg
227-3293 views25 km signal location on the BHP Newman mainline. 25 S for south bound trains, the other signal is 25 N. GeoData.
228-18.jpg
228-1893 viewsYandi Two, the only real land mark on the Yandi Two branchline is this bridge over an un-named creek at the YT307 km with the afternoon empty train on approach. Geodata -22.706976, 119.097651 .
229-33.jpg
229-3393 viewsYandi Two loadout exit side, as second unit 5642 'Wallareenya' serial 8281-07 / 92-131 a Goninan rebuild CM40-8M GE unit trails sister unit 5650 drag a loading train at 1.2 km/h around the loadout balloon, the waggon behind 5642 is an original Oroville waggon. GeoData.
230-02.jpg
230-0293 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
232-28.jpg
232-2893 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 shows the cab front with the sheet metal windscreen protectors. 18th of February 1997. GeoData.
234-13.jpg
234-1393 viewsYandi Two, loaded BHP Iron Ore waggon #4316 a Goninan built flat floor 3CR12 style stainless steel construction from 1997.
235-18.jpg
235-1893 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
236-25.jpg
236-2593 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 being driven out.
236-27.jpg
236-2793 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 rear end with AC6000 unit 6076 beside it.
3720 files on 186 page(s) 126

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional