Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250-17.jpg
250-17409 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
251-12.jpg
251-12409 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5511 builders plate. 22nd April 2000.
283-19.jpg
283-19409 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
110620_2489r.jpg
1035 Comeng 110620 2489409 viewsWalla, loaded BHP ore waggon 1035, the resheeting is obvious with the stich welds along the ribs, 1035 is one of the four hundred waggons built by Comeng WA in 1971, when the numbering reached 2999 they started numbering upwards from 1001. June 20, 2011.
250501_0547.jpg
250501 0547409 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2857 - GA 2858, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
221-26.jpg
221-26408 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
222-27.jpg
222-27408 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7073 serial 47752 a General Electric Dash 9-44CW built by GE at Erie with 7091 has stopped for a crew change besides a loaded headed up by 7071.
222-34.jpg
222-34408 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066 serial 47745.
227-05.jpg
227-05408 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Power Station can be seen in the distance. GeoData.
227-18.jpg
227-18408 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
231-03.jpg
231-03408 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 'Yawata' serial 8412-07 / 93-141, note the difference in the liveries, 50 is in the teal and marigold logo and logo on the hood while 52 has the silver logo on the front only and no logo on the hood. GeoData.
232-20.jpg
232-20408 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls, view of broken coupler. February 1997. GeoData.
233-05.jpg
233-05408 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
234-33.jpg
234-33408 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
040815_171406.jpg
0020 Comeng NSW 040815 171406408 viewsNelson Point, side view of A end and bogie detail view of fuel tank waggon 0020, 82 kilolitre capacity built by Comeng NSW for BP as RTC 2, used by Mt Newman Mining, unsure when converted to 0020.
050319_0144.jpg
6011 Scotts of Ipswich Qld 050319 0144408 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
050412_0764.jpg
0533 Magor USA 050412 0764408 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
050412_0769.jpg
0524 Magor USA 050412 0769408 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 524, originally in ore service before conversion to a ballast waggon.
050518_2093.jpg
CHRY 758 050518 2093408 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 758.
050518_2136.jpg
CHRY 753 050518 2136408 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, defect card holder.
6220 files on 311 page(s) 132

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional