Most viewed - Pilbara negative and digital Albums - Iron Ore |

268-36318 viewsAt the 39 km detection site with the Alstom 25-year special, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star, a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port. 12th of April 2002.
|
|

284-24318 viewsNarngulu, Geraldton, former Westrail P class loco P 2014 'Shire of Wongan-Ballidu' built by Goninan WA as a GE CM25-8 model with serial number 6320-12 / 90-099 sits in the yard in-between shunt movements. November 10, 2004.
|
|

220-32317 viewsGoldsworthy Junction, trailing shot of the afternoon departure for Yandi mine behind the standard double Dash 8 power consist, heading towards Bing Siding with the Flashbutt Yard visible in the distance.
|
|

227-06317 viewsNelson Point, view along B berth with Shiploader 1, this loader has since been replaced. In the distance now are berths E and F, Redbank Powerstation can be seen in the distance. GeoData.
|
|

227-11317 viewsPort Hedland harbour control tower, the salt conveyor is at the bottom of the picture, the high building beyond the tower is the Esplanade Hotel, with the two story building to the right of the tower the Port Authority offices. GeoData.
|
|

227-20317 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

227-23317 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind Goninan CM40-8M GE rebuilds 5649 'Pohang' serial 8412-07/93-140 and 5651 with third unit an General Electric AC6000. GeoData.
|
|

228-22317 viewsYandi Two branch, the afternoon empty train mid-train remotes cross the bridge at the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
|
|

231-27317 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

232-03317 viewsYandi Two, view to the stockpile looking west from near the 311.6 km grade crossing. A train can be seen loading on the right. February 1997. GeoData.
|
|

235-00317 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new. The loadout operator is walking past the train.
|
|

235-04317 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

050412 0767317 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 533, originally in ore service before conversion to a ballast waggon.
|
|

050518 2077317 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 751.
|
|

050518 2090317 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 749.
|
|

050518 2132317 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761, shows bogie detail, ASF Ride Control bogie with CFCLA id of CQFE 111.
|
|

050518 2165317 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|

050518 2172317 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050704 3985317 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

050801 4768317 viewsFlash Butt yard, rail recovery and transport train, builders plate of 3rd lead off waggon 6205, built by Comeng WA, January 1977 under order no. 07-M-282 RY.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
139 |  |
 |
 |
 |
 |
 |
 |
|