Most viewed - Pilbara negative and digital Albums - Iron Ore |

231-22209 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the silver logo on the rear and the missing logo from the hood, the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.
|
|

231-34209 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

233-30209 viewsYandi Two, BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5642 'Wallareenya' serial 8281-07 / 92-131 shows the ALCo heritage from the frame down and is wearing the teal and marigold logo. GeoData.
|
|

235-01209 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
|
|

236-25209 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with AC6000 units 6072 being driven out.
|
|

050412 0761209 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 512.
|
|

050412 0773209 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

050412 0775209 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 502.
|
|

050518 2106209 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 752.
|
|

050518 2138209 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, non hand brake end detail, including bogie.
|
|

050518 2157209 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2165209 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 523, originally in ore service before conversion to a ballast waggon.
|
|

050518 2179209 viewsBing Siding. Side view of 1963 built Magor USA waggon 520, the last of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2180209 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 517, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2184209 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 532, originally in ore service before conversion to a ballast waggon.
|
|

050518 2191209 viewsBing Siding. Side view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2202209 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

050704 3988209 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

050801 4769209 viewsFlash Butt yard, rail recovery and transport train flat waggon #27, third lead off waggon, 6205, built by Comeng WA in January 1977 under order no. 07-M-282 RY.
|
|

051001 5686209 viewsBoodarie, the Steel Train or rail recovery and transport train, hand brake end of waggon #12, 6209, a Comeng WA built flat waggon from January 1977 under order no. 07-M-282 RY.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
139 |  |
 |
 |
 |
 |
 |
 |
|