Most viewed - Pilbara negative and digital Albums - Iron Ore |

0010 Comeng NSW 110411 09978404 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
|
|

141124 7092404 viewsRio Tinto compressor waggon set leader CB 01, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here at 7 Mile, Dampier on 24th November 2014.
|
|

241-30404 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.
|
|

246-35404 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

247-29404 viewsCape Lambert fuel point, Robe River locomotive 9410 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 2160-03 / 96-202 from March 1996 riding on Dofasco bogies and was originally a Comeng NSW built M636 ALCo serial C-6096-5 and built new for Mt Newman Mining (later BHP Iron Ore) in November 1975 and numbered 5500. Everything below the frame is ALCo, with the Comeng build style flat fuel tank, while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|

247-34404 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train passes under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 with 9410, 9420 and last unit 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. Location is here.22nd May 2002.
|
|

248-16404 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.
|
|

254-15404 viewsFlash Butt yard, stored with no engine Goninan ALCo to GE rebuild C36-7M unit 5506 with serial number 4839-01 / 87-071. This was the first unit in the world to be built into a C36-7 from an ALCo C636 locomotive. It was rebuilt 1987 from AE-Goodwin built ALCo C636 numbered 5455 with serial number G6012-4.
|
|

257-25404 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. The four styles of waggon in use are visible, behind the loco are three Golynx waggons, then a number of Gunderson USA builds, the ribbed type is a Portec USA built and then following are the Tomlinson WA and Scotts of Ipswich built 70 ton waggons. Late 2001.
|
|

226-09403 viewsRedmont, at the 202 km the mid-train remotes Goninan rebuild CM40-8M GE unit 5644 'Kangan' serial 8281-09/92-133 leads sister unit 5639. GeoData.
|
|

227-16403 viewsNelson Point, from the rear of Shiploader 2 looking south with Shiploader 1 on the right on B berth, and the ore transporting infrastructure. GeoData.
|
|

227-19403 views30 km area on the Newman mainline, east of the original Quarry 1, an empty train powers along the gentle .17% rising grade behind a pair of Goninan CM40-8M GE rebuild units and an General Electric AC6000. GeoData.
|
|

234-10403 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of left hand side radiator section. Circa 1998.
|
|

040806 091334403 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

0206 Mt Newman Mining Workshops 040806 102052403 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.
|
|

0206 Mt Newman Mining Workshops 040806 102110403 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.
|
|

0206 USA 050518 2121403 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end.
|
|

0503 Magor USA 050518 2172403 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

6201 Comeng WA 050801 4767403 viewsFlash Butt yard, rail recovery and transport train, #28 2nd lead off waggon 6201, built by Comeng WA January 1977 under order no. 07-M-282 RY, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.
|
|

060429 3728403 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
140 |  |
 |
 |
 |
 |
 |
 |
|