Most viewed - Pilbara negative and digital Albums - Iron Ore |

233-01369 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
|
|

234-22369 viewsYandi Two, BHP Iron Ore Goninan rebuild CM39-8 GE unit 5630 'Zeus' serial 5831-09 / 88-079 is second unit on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Rear three quarter view. Circa 1998.
|
|

235-34369 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the unit has no marker lights and the tank tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

050412 0760369 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 515.
|
|

050412 0765369 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 503.
|
|

050518 2082369 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
|
|

050518 2118369 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, side view.
|
|

050518 2134369 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740, shows brake rigging plate for original owner, M&ST L.
|
|

050518 2180369 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 517, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|

050518 2182369 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
|
|

050518 2203369 viewsBing Siding, view of number plate and original markings on ballast waggon 519.
|
|

051001 5707369 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
|
|

051001 5717369 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, builders plate, a Scotts of Ipswich Qld built flat waggon on 12th September 1970.
|
|

060618 6209369 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8701 side dump waggon loaded with fines for pad capping.
|
|

060618 6210369 viewsAbydos Siding, originally built by Difco USA for Goldsworthy Mining Ltd in 1967 as a batch of five, prefixed with 870 in BHP service, 8703 side dump waggon loaded with fines for pad capping.
|
|

060618 6220369 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 567, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
|
|

060710 6301369 viewsBoodarie Yard, modified original Magor USA built Oroville waggon 589, cut down and covered and in use as indexing waggons on the front of each rake for Finucane Island car dumpers, note the original ODCX marking visible.
|
|

050421 1614369 viewsHesta Siding backtrack, Speno Australia's 24 stone rail grinder before they had id stickers fitted, this unit was later stickered as RG 2, side view of the first grinding module. 21st April 2005.
|
|

050625 3818369 viewsNode 2 at the 38 km on the GML or former Goldsworthy mainline, three Barclay Mowlem sleeper inserter track machines off clear of the running lines. 25th June 2005.
|
|

050801 4749369 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
142 |  |
 |
 |
 |
 |
 |
 |
|