Most viewed - Pilbara negative and digital Albums - Iron Ore |

248-24143 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.
|
|

249-21143 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

251-23143 viewsNelson Point hard stand area, BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
|
|

253-20143 viewsNelson Point hard stand area, a delivery of CFCLA lease ballast hopper waggons coded CHRY await entry to service. These waggons were bought over from the USA with code CRDX for CFCL by CFCLA with work and repainting carried out at Gemco WA.
|
|

257-17143 viewsFlash Butt yard, view of Rail Dynamics Laboratory test waggon 2703 - Test Car R2, modified by BHP from waggon number 2716 in 1975, originally a Comeng built waggon dating from 1971. Late 2001.
|
|

267-20143 viewsGoldsworthy Junction, CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 leads the Sundowner Special on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in the middle and sister CM40-8M 5653 bringing up the rear.
This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 are holding track.
They can be seen behind the signal sitting on the transfer road.
Friday 12th of April 2002.
|
|

267-22143 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
|
|

268-14143 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

269-15143 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

283-31143 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they power through the cutting up a short grade at the 37.5 km pipe bridge. 9414 with serial number 8206-11 / 91-124 was rebuilt by Goninan in 1991 from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. 22nd of May 2002.
|
|

226-27142 viewsShaw siding at the 219 km a loaded train with power from two Goninan CM40-8M GE rebuild units 5642 'Wallareenya' serial 8281-07 / 92-131 and sister unit 5636, the mid-train remotes can be seen in the distance topping the grade. GeoData.
|
|

230-30142 viewsYandi Two balloon loop, Goninan GE CM40-8M rebuild 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. 5637 has the silver BHP logo on the end but the hood logo has been painted out. Geodata -22.718338, 119.039909 .
|
|

230-32142 viewsYandi Two balloon loop, cab side view of Goninan rebuild GE CM40-8M model 5637 'De Grey' serial 8181-01/92-123 with ALCo Hi-Ad bogie. Geodata -22.718338, 119.039909 .
|
|

233-10142 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

234-37142 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

050412 0751142 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 532, originally in ore service before conversion to a ballast waggon.
|
|

050518 2072142 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 730.
|
|

050518 2098142 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740.
|
|

050518 2132142 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 761, shows bogie detail, ASF Ride Control bogie with CFCLA id of CQFE 111.
|
|

050518 2158142 viewsBing Siding. Side view of 1963 built Magor USA waggon 501, the first of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
142 |  |
 |
 |
 |
 |
 |
 |
|