Most viewed - Pilbara negative and digital Albums - Iron Ore |

050801 4773208 viewsIn the Flash Butt yard a line up of Barclay Mowlem track machines from the closest to the camera, tamper, regulator, regulator, tamper, clip installer, tamper then BHP's mainline tamper. 1st August 2005.
|
|

100717 0656208 viewsFlash Butt yard, new rail stock carrier waggon 6020, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0666208 viewsFlash Butt yard, new rail stock carrier waggon 6023, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

100717 0677208 viewsFlash Butt yard, new rail stock carrier waggon 6022, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110411 10001208 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

110411 10009208 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0011 from 1972, one of three such tank waggons.
|
|

110411 10017208 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0013 from 1974-5, one of six such tank waggons.
|
|

130720 1437208 viewsFlash Butt yard, CFCLA ballast waggon CHTY class CHTY 715, modified from a similar CHQY class with the end framing removed.
|
|

243-18208 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

080304 2183208 viewsThomas Yard, down the rail welding end, side view of control waggon 2338, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-36208 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|

248-06208 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. The blue 230 sign is the indication that there is 230 waggons in clear at that point. Approximate location. 24th April 2004.
|
|

249-03208 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-20208 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

249-23208 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking downstream to the west following Cyclone John on 18th December 1999. Approximate location.
|
|

210510 1103208 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 017 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

268-37208 viewsA battery that has been in a fire.
|
|

269-22208 viewsGoldsworthy Junction, and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

283-19208 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

110620 2040r208 viewsWalla Siding, empty BHP ore waggon 2899, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The steel panels in the ribs have been resheeted, but not the end panels. 20th of June 2011.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
142 |  |
 |
 |
 |
 |
 |
 |
|