Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
110620_2489r.jpg
110620 2489r369 viewsWalla, loaded BHP ore waggon 1035, the resheeting is obvious with the stich welds along the ribs, 1035 is one of the four hundred waggons built by Comeng WA in 1971, when the numbering reached 2999 they start numbering upwards from 1001. 20th of June 2011.
220-31.jpg
220-31368 viewsGoldsworthy Junction, the afternoon empty departure for Yandi mine behind the standard double Dash 8 power consist of 5649 'Pohang' a Goninan GE rebuild CM40-8M model serial 8412-07 / 93-140 and a sister unit as the split the sticks, the line merging from the right is the former Goldsworthy line from Yarrie and Nimingarra mines. This area is now fully duplicated with LED signals and the Dash 8 units have been scrapped.
229-32.jpg
229-32368 viewsYandi Two loadout exit side, as second unit 5642 'Wallareenya' serial 8281-07 / 92-131 a Goninan rebuild CM40-8M GE unit trails sister unit 5650 drag a loading train at 1.2 km/h around the loadout balloon, the waggon behind 5642 is an original Oroville waggon. GeoData.
231-10.jpg
231-10368 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
233-01.jpg
233-01368 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
235-05.jpg
235-05368 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
235-10.jpg
235-10368 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
050518_2082.jpg
050518 2082368 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
050518_2203.jpg
050518 2203368 viewsBing Siding, view of number plate and original markings on ballast waggon 519.
051001_5707.jpg
051001 5707368 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
051001_5717.jpg
051001 5717368 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #24, 6005, builders plate, a Scotts of Ipswich Qld built flat waggon on 12th September 1970.
060618_6220.jpg
060618 6220368 viewsFlash Butt yard, modified original Magor USA built Oroville waggon 567, cut down and covered for use as indexing waggons at Finucane Island car dumpers, note the original ODCX marking visible.
050801_4749.jpg
050801 4749368 viewsFlash Butt yard, BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 1st August 2005.
080621_2719.jpg
080621 2719368 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6103 in service with the rail recovery and transport train as waggon #3.
080621_2729.jpg
080621 2729368 viewsGillman Siding, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, detail of A end.
110411_09996.jpg
110411 09996368 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_09999.jpg
110411 09999368 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
110620_2278.jpg
110620 2278368 viewsChapman, FMG TK type fuel tank waggon TK 08 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
251-18.jpg
251-18368 viewsNelson Point wheel lathe, BHP's General Electric built AC6000 model 6074 serial 51066 and yet to be named idles away outside the shop. 22nd April 2000.
253-31.jpg
253-31368 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
6096 files on 305 page(s) 143

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional