Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
224-24.jpg
224-24316 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
225-27.jpg
225-27316 viewsBing siding backtrack, a ballast consist of 17 GML bottom discharge waggons and 6 Difco side dump rip rap waggons, possibly an 'emergency' ballast train for the GML line following flood damage. GeoData.
227-12.jpg
227-12316 viewsNelson Point, view from rear of Shiploader 2, salt pile, manganese stockpile in the distance, stacker 3, the Port Hedland water tower, then 101-102 sample station and Tertiary Crushing Building One or TCB1, stacker 4 and reclaimer 3 with the under harbour portal in the foreground. GeoData.
228-26.jpg
228-26316 viewsYandi Two balloon loop, the afternoon empty train arrives at the load-out tunnel behind a standard pair of Goninan rebuilt GE CM40-8M model units 5649 'Pohang' serial 8412-07/93-140 and 5644 'Kangan' serial 8281-09/92-133. Geodata -22.720824, 119.043410 .
231-32.jpg
231-32316 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.
233-01.jpg
233-01316 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
234-12.jpg
234-12316 viewsYandi Two, loaded BHP Iron Ore waggon #4316 a Goninan built 3CR12 style stainless steel construction from 1997. Handbrake and bogie view.
234-15.jpg
234-15316 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5640 'Ethel Creek' serial 8281-05 / 92-129 is on the rear of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View of right hand side leading bogie. Circa 1998.
234-33.jpg
234-33316 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
235-01.jpg
235-01316 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train with second unit Goninan built CM39-8 unit 5630 'Zeus', notice the fuel tank differences between the lead unit an ALCo rebuild and the second unit built new.
236-10.jpg
236-10316 viewsNelson Point, Loco Overhaul Shop, BHP AC6000 class locomotive 6072 'Hesta', a General Electric built AC6000 model, serial 51064, seen here in the shed having the windscreen protectors or 'blinkers' fitted.
236-29.jpg
236-29316 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
040810_145555.jpg
040810 145555316 viewsShaw Siding backtrack, view looking south with Quarry 8 track leading off to the right, a line up of Difco Ohio USA built side dump waggons, a combination of both Mt Newman long and short versions and Goldsworthy Mining short version no. 4 closest to camera.
050518_2086.jpg
050518 2086316 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 757.
050518_2098.jpg
050518 2098316 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 740.
050518_2171.jpg
050518 2171316 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050518_2195.jpg
050518 2195316 viewsBing Siding. Side view of 1963 built Magor USA waggon 504, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5623.jpg
051001 5623316 viewsFlash Butt yard, BHP flat waggon 6705 ROA code of AQPY 2916, 55 tonne capacity, unsure of original owner, possible AN AOOX, then cut down to the Pilbara through CFCLA, 3/4 view.
060429_3728.jpg
060429 3728316 viewsFlash Butt yard, Pony re-laying waggon, #2, originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966.
060429_3735.jpg
060429 3735316 viewsFlash Butt yard, Pony re-laying waggon, 6002 originally built for Goldsworthy Mining as one of a batch of six with a 55 tonne rating by Tomlinson Steel in 1966 of which three were sold to Mt Newman Mining in 1967 and numbered 6001-6003.
6096 files on 305 page(s) 143

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional