Most viewed - Pilbara negative and digital Albums - Iron Ore |

220-31368 viewsGoldsworthy Junction, the afternoon empty departure for Yandi mine behind the standard double Dash 8 power consist of 5649 'Pohang' a Goninan GE rebuild CM40-8M model serial 8412-07 / 93-140 and a sister unit as the split the sticks, the line merging from the right is the former Goldsworthy line from Yarrie and Nimingarra mines. This area is now fully duplicated with LED signals and the Dash 8 units have been scrapped.
|
|

080621 2719368 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6103 in service with the rail recovery and transport train as waggon #3.
|
|

110411 09996368 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
|
|

253-31368 viewsNelson Point yard sees BHP dumper pilot locomotive 5666 'Taranto', a Goninan GE rebuild CM40-8MEFI model with serial 8412-11 / 94-157, 5666 was the first unit fitted with Electronic Fuel Injection to the 16FDL engine hence the EFI on the model designation.
|
|

267-15368 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
|
|

268-03368 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

240701 2729368 viewsPilbara Railways Historical Society, passenger carriage 'Weelumurra' was originally built by Clyde Engineering at Granville NSW in 1936 for the NSWGR as a second class railway carriage FS type FS 2138. In 1975 it was purchased by the Society and is named after a local river. July 1, 2024.
|
|

240701 2795368 viewsPilbara Railways Historical Society, from left, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. July 1, 2024.
|
|

250501 0310368 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2395 - GA 2396, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|

226-01367 viewsYule River bridge showing new piles and deck to replace flood damaged piles after a cyclone that closed the line for two weeks in the late 1990s. GeoData.
|
|

226-32367 viewsShaw siding at the 219 km, mid-train remote units Goninan CM40-8M GE rebuilds power past the rail grinder. GeoData.
|
|

232-21367 viewsYandi One loadout portal as a train is being loaded. Waggons are from left, a 3CR12 re-sheeted Comeng, an Oroville built by Magor USA and a standard Comeng WA build. 18th of February 1997. GeoData.
|
|

233-21367 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

234-27367 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. Cab front on view. Circa 1998.
|
|

234-37367 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

040806 091930367 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

040806 102052367 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of the removed deck showing chutes.
|
|

050412 0757367 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 517.
|
|

050412 0773367 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 535, originally in ore service before conversion to a ballast waggon.
|
|

050421 1385367 viewsQuarry 8, Magor USA built ballast waggon 516, originally built in 1963 for the Oroville Dam project, before coming to BHP second hand as a ballast waggon in January 1968.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
144 |  |
 |
 |
 |
 |
 |
 |
|