Most viewed - Pilbara negative and digital Albums - Iron Ore |

207-08315 viewsBHP General Electric built AC6000 unit 6074 serial 51066, brand new and unnamed at Yandi One load-out loop as a remote mid-train unit.
|
|

218-04315 viewsDe Grey River, Toyota Land Cruiser Toy Titan, 1994 HJ75 series tray back.
|
|

219-04315 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7090 serial 47769 and 7089 idle away waiting their next loaded train to push out.
|
|

151111 9481315 viewsCape Lambert Yard, Chinese built Bradken ore cars, control car 20292 and slave car 25292.
|
|

150522 8165315 viewsWedgefield, Sims Metal yard, the first batch of BHP Billiton Dash 8 locos to be scrapped, 5646 serial 8244-11/92-135 and 5647 serial 8244-12/92-136 were a pair of new Goninan WA CM40-8 model built in 1992.
|
|

150522 8184315 viewsWedgefield, Sims Metal yard, no. 2 end of Goninan WA rebuild CM40-8M unit 5638 serial 8281-02/92-127, for full details of these units past lives see here .
|
|

200914 iPhone IMG 8833315 viewsPilbara Railways Historical Society, driver position view of Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th September 2020.
|
|

196-10314 viewsYandi Two loaded car side of the loadout balloon loop, BHP Iron Ore CM40-8M or Dash 8 motive power in the form of 5658 'Kakogawa' serial 8412-03 / 94-149 rebuilt by Goninan as GE model CM40-8M from ALCo M636C number 5480 and two new Goninan built GE CM39-8 units 5630 'Zeus' serial 5831-09 / 88-079 and 5631 'Apollo' serial 5831-10 / 88-080 are the head end power with another two CM40-8M units mid-train. Train length is 240 waggons with a 120/120 split. Yandi Two ore stockpile and pedestal stacker boom tip visible in the background, the loadout operates via gravity and the train travels through a tunnel. May 1998.
|
|

218-15314 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
|
|

223-22314 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000
|
|

180616 1810314 viewsEmu Siding, an empty train from Cape Lambert powers upgrade away from Emu Siding up the 1.6 percent grade behind Rio Tinto loco 8149 with serial 58730 a GE Erie built GE model ES44DCi from the 3rd order in Rio Tinto Stripes livery and 8193 with Dash 9-44CW unit 7089 with a consist of S and C type waggons. 16th June 2018. GeoData.
|
|

247-09314 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
|
|

250-05314 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

250-31314 viewsCape Lambert yard in the Load Box is recently stored Robe River AE Goodwin built ALCo M636 unit 9415 serial G6060-6 from February 1973 and was an extension of the original order and delivered with cab side numbering of 86-14-1715 and number boards as 1715. The ducting on the hood is the air to air intercooler modifications. 22nd October 2000.
|
|

203-07313 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.
|
|

218-11313 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

219-20313 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train, the waggon behind 5507 is numbered 352 and is one of ten Portec USA built waggons originally from Phelps Dodge Copper Mine.
|
|

150523 8234312 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, a fork lift carries waggon no. 3340, one of 350 waggons built in Romania of which only about 60 made it into service, the rest rusting away in a caged embargo area out on the Broome Road until they were scrapped some years ago. There is a connection with these waggons and Lang Hancock and his former mine McCamey's Monster, now known as Jimblebar. 5665 looks on, its days also numbered.
|
|

242-18312 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

041014 142058312 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
15 |  |
 |
 |
 |
 |
 |
 |
|