Most viewed - Pilbara negative and digital Albums - Iron Ore |

234-2380 viewsYandi Two, BHP Iron Ore Goninan rebuild CM39-8 GE unit 5630 'Zeus' serial 5831-09 / 88-079 is second unit on the front of a 240 waggon loaded train, engine hood and fuel tank arrangement view, note the difference to the ALCo rebuilds. Circa 1998.
|
|

234-2680 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking from 5658 back to the ore stockpile at the loadout. Circa 1998.
|
|

100329 804180 viewsRio Tinto compressor waggon set CB 05, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons and the wheels are marked 70 kph max. Seen here just outside of 7 Mile. 29th March 2010.
|
|

241-2480 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation with two C36-7M units 5506 and 5510 also awaiting removal from site. June 2002.
|
|

243-0180 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2 stands in the morning sunlight. August 2003.
|
|

249-2080 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|

268-2880 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

231-2479 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.
|
|

231-3479 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
|
|

233-2279 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

235-2979 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
|
|

171121 096479 viewsBarker Siding, Loram rail grinder MPC 2, control and grinder car. 21st November 2017.
|
|

171121 096979 viewsBarker Siding, Loram rail grinder MPC 2, driving and generator end of a converted 85 foot waggon. 21st November 2017.
|
|

080116 137479 viewsChapman Siding, FMG master waggon 2396 tare 22.9 tonnes coupled with Janney Type F Interlock couplers and CSR type bogie. Built by CSR (China Southern) Zhuzhou Rolling Stock Works in China during 2007. 16th January 2008.
|
|

080304 220479 viewsThomas Yard, down the rail welding end, side view of control waggon 2516, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

080304 220679 viewsThomas Yard, down the rail welding end, side view of control waggon 2528, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

246-1079 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

243-3779 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

248-1579 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.
|
|

249-2179 viewsFortescue River Bridge on the Robe River line at the 115.8 km in flood looking south following Cyclone John on 18th December 1999. Approximate location.
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
154 |  |
 |
 |
 |
 |
 |
 |
|