Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
268-02.jpg
268-02135 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
283-01.jpg
283-01135 viewsNelson Point, BHP wheel lathe sees BHP's big GE AC6000 unit 6073 'Fortescue' serial number 51065 on shed having wheel attention to the leading bogie. May 2002.
230-29.jpg
230-29134 viewsYandi Two balloon loop, two Goninan GE CM40-8M rebuilds from different ALCo builders. 5654 'Kashima' serial 8412-11/93-145 is from Comeng ALCo M636 unit 5493 while 5637 'De Grey' serial 8181-01/92-123 is from an AE Goodwin ALCo C636 unit 5456. 5654 wears the marigold BHP logo while 5637 has the silver logo on one the ends. Geodata -22.718338, 119.039909 .
233-08.jpg
233-08134 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
233-22.jpg
233-22134 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
235-07.jpg
235-07134 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
236-19.jpg
236-19134 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with sister 5652 behind it and the rear of an AC6000 visible.
050518_2191.jpg
050518 2191134 viewsBing Siding. Side view of 1963 built Magor USA waggon 513, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
050522_2734.jpg
050522 2734134 viewsGoldsworthy Junction, rail recovery and transport train flat waggon #24, 6005 with registered number G506007, built by Scotts of Ipswich Qld in 1970.
100717_0673.jpg
100717 0673134 viewsFlash Butt yard, new rail stock carrier waggon 6034, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0679.jpg
100717 0679134 viewsFlash Butt yard, new rail stock carrier waggon 6032, built by Gemco Rail in late 2009-10 with Barber bogies.
110208_9444.jpg
110208 9444134 viewsFlash Butt yard, new rail stock carrier waggon 6038 loaded with strings of rail, built by Gemco Rail in late 2009-10 with Barber bogies.
110411_09997.jpg
110411 09997134 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_10012.jpg
110411 10012134 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0017 from 1974-5, one of six such tank waggons.
130720_1448.jpg
130720 1448134 viewsFlash Butt yard, CNR-QRRS of China built 99 tonne ballast waggon 0214 loaded awaiting their next duty.
080304_2198.jpg
080304 2198134 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1535 slave and 2536 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2207.jpg
080304 2207134 viewsThomas Yard, down the rail welding end, side view of slave waggon 1523, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
249-08.jpg
249-08134 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
252-03.jpg
252-03134 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
252-09.jpg
252-09134 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
4019 files on 201 page(s) 156

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional