Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
236-33.jpg
236-33199 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6077 'Nimingarra' serial 51069 sits out the front.
050412_0757.jpg
050412 0757199 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 517.
050518_2173.jpg
050518 2173199 viewsBing Siding. Side view of 1963 built Magor USA waggon 503, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
051001_5626.jpg
051001 5626199 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
051001_5708.jpg
051001 5708199 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #22, 6213, builders plate detail, a Comeng WA built flat waggon from February 1977 under order no. 07-M-282 RY.
051001_5736.jpg
051001 5736199 viewsBoodarie, the Steel Train or rail recovery and transport train, flat waggon #28, 2nd lead off waggon 6201, built by Comeng WA in January 1977 under order no. 07-M-282 RY, with the Gemco built straddle crane.
050801_4751.jpg
050801 4751199 viewsFlash Butt yard, BHP clip driving machine, modified from a former Plasser Australia USP 3000 ballast regulator. 1st August 2005.
110411_09978.jpg
110411 09978199 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
110411_09991.jpg
110411 09991199 viewsNelson Point, fuel tank waggon 0019 82 kL capacity, built by Comeng for BP as RTC 1, first of two such tanks, used on Mt Newman line, unsure when converted to 0019.
110411_09995.jpg
110411 09995199 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_09996.jpg
110411 09996199 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons.
110411_09998.jpg
110411 09998199 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
110411_10023.jpg
110411 10023199 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
110619_1887.jpg
110619 1887199 viewsSouth of Mooka Siding, the Steel Train or rail recovery and transport train, flat waggon #17, 6016 with registered number 6506-016, a Comeng WA built flat waggon from 1971.
160128_00340.jpg
160128 00340199 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
243-27.jpg
243-27199 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
080304_2187.jpg
080304 2187199 viewsThomas Yard, down the rail welding end, side view of control waggon 2238, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
080304_2197.jpg
080304 2197199 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1059 slave and 2060 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-27.jpg
246-27199 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
246-30.jpg
246-30199 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
4019 files on 201 page(s) 158

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional