Most viewed - Pilbara negative and digital Albums - Iron Ore |

283-2067 viewsHarding Siding, quad Robe River CM40-8M units 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

110620 2296r67 viewsWalla, loaded BHP ore waggon 1418 is a Goninan WA build to the Golynx design as a replacement body from February 2011. This replaces the original Comeng WA waggon of the same number. 20th of June 2011.
|
|

030712 14254367 viewsNelson Point, empty BHP ore waggon 553, one of the original Magor USA build waggons bought out at construction of the Mt Newman project. Visible is the ODCX code and number 82190 from the Oroville Dam Construction company days in the USA. Unsure of the MS6-82 code, the DZ 11-95 code was the late time it was internally painted to reduce wear and the SL 76 with 92 below it was the last time the Miner SL-76 draft gear was replaced. The orange smiley sticker indicates that this is an original 'Oroville Dam' ore waggon and non relayed AB braked. 12th of July 2003.
|
|

246-2766 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons with newly extended roads either side of it. In the distance can be seen are the railway workshops. 22nd May 2002.
|
|

246-3266 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 136 which is from the original order for 285 waggons from Nippon Sharyo Japan. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

246-3366 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 925 a Centurion Industries WA build. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

243-3066 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

248-0766 viewsDingo Siding on the Hamersley Iron railway at the 39 km with an empty train headed up by a pair of General Electric built Dash 9-44CW units 9408 serial 54158 from the fourth order in 2003 wearing the Pilbara Rail livery with Robe ownership markings. Approximate location. 24th April 2004.
|
|

249-0866 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-1366 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

210322 958366 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is CRRC Yangtze Rolling Stock Co of China built ballast plough waggon BP 04 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
|
|

267-1866 viewsGoldsworthy Junction, the Sundowner Special is on the Newman mainline leg of the Goldsworthy Junction and triangle, with the Sundowner coach in between CM40-8M GE unit 5634 'Boodarie' serial number 8151-07 / 91-120 and sister CM40-8M 5653. This train, and the empty before it, were delayed due to a jamming switch for the transfer road where Tamper 2 and Ballast Regulator 31 can be seen holding track. The road curving around to the left is the Goldsworthy mainline to Boodarie and Finucane Island. Friday 12th of April 2002.
|
|

268-0166 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

283-3266 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they power through the cutting up a short grade at the 37.5 km pipe bridge. 9414 with serial number 8206-11 / 91-124 was rebuilt by Goninan in 1991 from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. 22nd of May 2002.
|
|

246-3065 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline with the normal 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
|
|

247-3265 viewsNear Cooya Pooya at the 37.5 km on the Robe River Cape Lambert line an empty train is about to pass under the town water supply pipeline and pass through Lockyer Gap behind the standard Robe power of quad CM40-8M or Dash 8 locomotives led by 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Location is here.22nd May 2002.
|
|

249-0765 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-1165 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

249-1465 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|

251-0465 viewsNelson Point, BHP's recently retired Goninan WA ALCo C636 to GE C36-7M rebuild unit 5512 awaits its fate. Rebuilt in 1988 at Goninan's Welshpool factory from 1970 AE Goodwin built ALCo C636 with serial number G6041-1 and road number 5465 and assigned new serial number 4839-01 / 88-077. It was delivered in Mt Newman Mining orange and was named Hesta. 22nd April 2000.
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
161 |  |
 |
 |
 |
 |
 |
 |
|