Most viewed - Pilbara negative and digital Albums - Iron Ore |

235-08303 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5652 'Villanueva' serial 8412-09 / 93-143 arrives with the afternoon 240 waggon empty train, the hydraulic lines and dust extraction equipment frame the loco.
|
|

235-26303 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03 / 92-128 sits on a loaded train as second unit awaiting departure time. Note the fuel tank and air receiver unit that tells it was an AE Goodwin built C636 ALCo before rebuild.
|
|

050412 0758303 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA ballast waggon 512.
|
|

050518 2085303 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 757.
|
|

050518 2138303 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 753, non hand brake end detail, including bogie.
|
|

050704 3981303 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, detail of the A end and bogie, wearing the BHP Billiton Earth livery.
|
|

050704 3982303 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0015 from 1974-5, one of six such tank waggons, detail of the A end and bogie and the B end of 0018, both wearing the BHP Billiton Earth livery.
|
|

050704 3995303 viewsBing Siding, empty 116 kL Comeng WA built tank waggon 0014 from 1974-5, one of six such tank waggons.
|
|

050410 0523303 viewsNelson Point yard hard stand area rear view of brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

080621 2733303 viewsGillman Siding, view from rear of rail recovery and transport train with new Lead-Off Lead-On waggon STTR class STTR 6214 on the end built by Gemco Rail WA.
|
|

100717 0684303 viewsFlash Butt yard, new rail stock carrier waggon 6037, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

110411 09998303 viewsNelson Point, empty 116 kL Comeng WA built tank waggon 0018 from 1974-5, one of six such tank waggons, wearing the BHP Billiton Earth livery.
|
|

110411 10035303 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

110602 8604303 viewsRio Tinto compressor waggon set CB 04, compressor control waggon with two diesel powered Atlas Copco XAS 97's and the receiver waggon with two air tanks or receivers. Note the waggons are cut down ore waggons. Seen here on the causeway just outside of 7 Mile. 2nd June 2011.
|
|

241-13303 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. This image shows the Dash 8 radiator frame fitted to it following collision repairs, sister unit 5506 and M636 unit 5499. June 2002.
|
|

243-26303 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

110620 2276303 viewsChapman, FMG TK type fuel tank waggon TK 04 built by China Southern CSR at their Zhuzhou Rolling Stock Works plant in China in 2008 as part of an order for twelve tanks, is on the loaded fuel train to Cloud Break. 20th June 2011.
|
|

246-07303 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons, the just visible siding (rejoining) on the far left will become a compressor waggon holding road, the 6 km and Boat Beach Rd grade crossing are around the corner to the left. Closest to the camera is the extended No. 1 Road which becomes the Empty Car Line from car dumper one for the Deepdale traffic. Next is the original line or Mainline and the third line across is the Loaded Car Line for the West Angelas traffic to the new car dumper 2. 22nd May 2002.
|
|

247-23303 viewsCape Lambert overview of the fuel point, with a brace of four Goninan WA CM40-8M GE rebuilds finishing up refuelling before departing with another empty train as a loaded rake is dragged to the dumper behind them. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
|
|

249-03303 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
162 |  |
 |
 |
 |
 |
 |
 |
|