251-26.jpg
251-26127 viewsNelson Point hard stand area, view of the pilot and newly installed Leslie 5 chime horn, the original single horn can be seen below it. BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
251-27.jpg
251-27127 viewsNelson Point hard stand area, drivers side cab view of BHP's 5631 'Apollo' built new in October 1988 by Goninan as a GE CM39-8 model with serial number 5831-10 / 88-080. One of four such units built in 1988 and delivered in the Mt Newman orange livery. 22nd April 2000.
252-02.jpg
252-02127 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, ballast plough waggon BP 02 is on the end of a ballast rake being loaded. BP 02 has been converted from an Nippon Sharyo ore waggon with the mounting of an air compressor on top and the fitting of a plough blade, the waggon is also loaded with ballast for ballast. Location is roughly here. 24th November 2001.
252-21.jpg
252-21127 viewsNelson Point BHP Iron Ore's General Electric built AC6000 unit 6074 'Kalgan' serial number 51066 is shutdown near the wheel lathe. Early December 2001.
210510_1137.jpg
210510 1137127 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 016 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1148.jpg
210510 1148127 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 005 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
233-20.jpg
233-20126 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
233-24.jpg
233-24126 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
243-22.jpg
243-22126 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
080304_2187.jpg
080304 2187126 viewsThomas Yard, down the rail welding end, side view of control waggon 2238, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
246-32.jpg
246-32126 viewsCape Lambert, a Robe River loaded Deepdale train on the mainline with waggon 136 which is from the original order for 285 waggons from Nippon Sharyo Japan. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. 22nd May 2002.
247-15.jpg
247-15126 viewsCape Lambert overview of the fuel point, with a brace of four CM40-8M rebuilds finishing up refuelling before departing with another empty train. The workshops are to the left of the picture. Where I'm standing to take the picture is now all stockpile. Approximate location of photo is here. 22nd May 2002.
247-26.jpg
247-26126 viewsCape Lambert fuel point, Robe River locomotive 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
252-32.jpg
252-32126 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train crosses over the creek behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
210322_9569.jpg
210322 9569126 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 095 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210322_9577.jpg
210322 9577126 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 105 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
210322_9580.jpg
210322 9580126 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 122 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
253-04.jpg
253-04126 viewsDugite near the 64 km on the Dampier - Tom Price railway, as an empty Hamersley Iron ore train sits in the passing track behind General Electric 9-44CW unit 7066 with serial number 47745 as a loaded rolls by on the mainline behind sister 9-44CW unit 7078 serial number 47757. Both of these units are from the original order and built in October 1994.
256-06.jpg
256-06126 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
110620_2019r.jpg
110620 2019r126 viewsWalla Siding, empty BHP ore waggon 9081, renumbered from 2710, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
4019 files on 201 page(s) 164

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional