Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
269-09.jpg
269-09351 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
283-05.jpg
283-05351 viewsNelson Point, BHP wheel lathe sees BHP's big GE AC6000 unit 6073 'Fortescue' serial number 51065 on shed having wheel attention to the leading bogie. May 2002.
110620_2042r.jpg
110620 2042r351 viewsWalla Siding, empty BHP ore waggon 4238 is a Goninan WA build from an order of one hundred and twenty-six waggons in 1997 using 3CR12 stainless steel in an effort to eliminate internal painting and reducing wear on the waggon body, these were designated HC7081. 20th of June 2011.
030712_143051.jpg
030712 143051351 viewsNelson Point, empty BHP ore waggon 9023, originally built by Comeng in Mittagong NSW as a part of seven prototype ore waggons made from low carbon 301 stainless steel with an higher volume and aerodynamic flat sides and were bogieless with four independent radial wheel sets. Of the seven waggon, the first four had a flat floor and final three had a drop belly floor. The radial wheel sets were later replaced with conventional bogies. 12th of July 2003.
240701_2736.jpg
240701 2736351 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. July 1, 2024.
240701_2760.jpg
240701 2760351 viewsPilbara Railways Historical Society, PWT 1 the water gin waggon used with the steam locomotive Pendennis Castle, this waggon had a proportional valve fitted to control the Westinghouse brake system on the train via the vacuum brake on the Pendennis Castle. July 1, 2024.
240701_2763.jpg
240701 2763351 viewsPilbara Railways Historical Society, Australian built by Comeng NSW an MLW ALCo M636 unit formerly operated by Mt Newman Mining and BHP Iron Ore 5502 serial number C6096-7 built July 1976, retired in 1994 and donated to the Society in 1995. July 1, 2024.
227-10.jpg
227-10350 viewsNelson Point, a view from the rear of A berth at the salt pile and stacker, this was operated by Cargill at the time of the photo. The under harbour tunnel portal is on the right. GeoData.
233-06.jpg
233-06350 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty trains headlight can be seen in the tunnel. GeoData.
234-32.jpg
234-32350 viewsYandi Two, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 on the front of a 240 waggon loaded train, this configuration was trialled for a time with two Dash 8 locos, 120 waggons, Dash 8, 120 waggons and Dash 8. View looking across the YT315.8 km grade crossing and 5658 back to the ore stockpile at the loadout. Circa 1998.
050412_0761.jpg
050412 0761350 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 512.
050518_2192.jpg
050518 2192350 viewsBing Siding. 3/4 view of 1963 built Magor USA waggon 516, one of twenty waggons originally used on the Oroville Dam construction before coming to the Pilbara in January 1968 as ballast waggons.
110411_09980.jpg
110411 09980350 viewsNelson Point, empty 116 kL Comeng NSW built tank waggon 0010 from 1972, one of three such tank waggons.
110411_10035.jpg
110411 10035350 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
150619_9080.jpg
150619 9080350 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, A end and bogie detail.
080304_2196r.jpg
080304 2196r350 viewsThomas Yard, down the rail welding end, new FMG ore waggon pair 1611 slave and 2612 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
249-11.jpg
249-11350 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
210510_1111.jpg
210510 1111350 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 009 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-03.jpg
253-03350 viewsDugite near the 64 km on the Dampier - Tom Price railway, a loaded Hamersley Iron train headed up by General Electric 9-44CW units 7078, from the original order, serial number 47757 and 7096, from the second order, serial number 52843 arrive taking the mainline to cross an empty which is in the passing track.
253-06.jpg
253-06350 viewsDugite near the 64 km on the Dampier - Tom Price railway, second unit on a loaded Hamersley Iron train General Electric 9-44CW unit 7096 from the second order of locomotives with serial number 52843.
6096 files on 305 page(s) 168

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional