Most viewed - Pilbara negative and digital Albums - Iron Ore |

283-30191 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they power through the cutting up a short grade at the 37.5 km pipe bridge. 9414 with serial number 8206-11 / 91-124 was rebuilt by Goninan in 1991 from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. 22nd of May 2002.
|
|

240701 2773191 viewsPilbara Railways Historical Society museum, 5450 a USA built EMD model F7A serial 8970 and frame 3006-A9, built Jan-1950 for Western Pacific Railroad as 917-A, imported for the Mt Newman Mining Co. to construct their Port Hedland to Newman railway in December 1967. Donated to the Society in 1978. July 1, 2024.
|
|

240701 2795191 viewsPilbara Railways Historical Society, from left, the ALCo S2 Hamersley Iron 007 'Mabel', ALCo C415 demonstrator Hamersley Iron 1000, English Electric ST95B Goldsworthy Mining 1, ALCo M636 BHP 5502 and EMD F7A Mt Newman Mining 5450. July 1, 2024.
|
|

284-30191 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
|
|

224-37190 viewsBing siding, mid-train remote on the afternoon Yandi departure 6075 serial 51067 a General Electric AC6000 built by GE at Erie departs south. GeoData.
|
|

233-01190 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. GeoData.
|
|

233-02190 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. An empty train can be seen about to enter the tunnel. GeoData.
|
|

233-29190 viewsYandi Two loaded car side of load-out tunnel, a loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

235-22190 viewsYandi One, BHP Iron Ore Goninan rebuild CM40-8M GE unit 5654 'Kashima' serial 8412-11 / 93-145 sits on a loaded train awaiting departure time with second unit also a Goninan GE rebuild 5639 'Corunna Downs' serial 8281-03 / 92-128, note the differences in the two locos as 5653 is rebuilt from a Comeng built ALCo M636 while 5639 was an AE Goodwin built ALCo C636. 5654 also has the late marigold style BHP logo.
|
|

236-19190 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention, with sister 5652 behind it and the rear of an AC6000 visible.
|
|

236-22190 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

110411 10008190 viewsNelson Point, empty 82 kL Comeng NSW built tank waggon 0007 one of six such tank waggons built in 1970-71.
|
|

243-31190 viewsNelson Point departure yard, BHP Billiton's CM40-8M unit 5634 'Boodarie' a Goninan WA GE rebuild unit serial 8151-07 / 91-120 in the new 'earth' or 'bubble' livery as it heads up an empty train waiting departure time. August 2003.
|
|

249-10190 viewsYule River bridge south abutment showing the chainage of the railway line. Approximate location.
|
|

252-13190 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7087 with serial number 47766 from the original 1994 build idles away on the western end of the ballast train. Cab side view. Location is roughly here. 24th November 2001.
|
|

210510 1109190 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 011 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

253-27190 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 757.
|
|

255-02190 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.
|
|

256-04190 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-26190 viewsMaitland Siding, Robe River CM40-8M unit 9418 on an empty train. 9418 was built by ALCo Schenectady NY USA as an ALCo C630 model in October 1967 with serial number 3486-02 for the Chesapeake and Ohio Railroad Company (USA) with road number 2101. It was purchased by Morrison Knudsen for Robe River (along with three sister units) and delivered in January 1975 and repainted and renumbered as 9418 on arrival. 9418 was rebuilt by Goninan WA in December 1990 to become an CM40-8M model with serial number 8109-12 / 90-118. May 2002.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
169 |  |
 |
 |
 |
 |
 |
 |
|