Most viewed - Pilbara negative and digital Albums - Iron Ore |

229-19343 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading train through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the original pedestal radial stacker is visible above the ore along with the extraction fan. GeoData.
|
|

233-20343 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h with assistance from two sister units. GeoData.
|
|

236-21343 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6072 'Hesta' serial 51064 is having the new windscreen protectors or 'blinkers' fitted.
|
|

050518 2200343 viewsBing Siding. Rear 3/4 view of ballast train and of 1963 built Magor USA waggon 536, originally in ore service before conversion to a ballast waggon.
|
|

150523 8209343 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0034, one of a second batch delivered in 2015 with safety slogan 'Think Safe + Work Safe = Go Home Safe'.
|
|

243-25343 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

243-28343 viewsNelson Point departure yard, BHP Billiton's CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 and built new by Goninan in the new 'earth' or 'bubble' livery as it trails an empty train waiting departure time. August 2003.
|
|

252-16343 viewsRosella Junction looking south at the 251 km. The line to the left goes to Marandoo and Yandicoogina, the straight to Tom Price and Paraburdoo and the right heads to Brockman. Location is roughly here. 24th November 2001.
|
|

252-24343 viewsAbydos area, known as the China Wall or London Wall.
|
|

254-13343 viewsBoodarie, BHP empty train arrives back at the yard following unloading at Finucane Island behind Goninan built CM39-8 locomotive 5631 'Apollo' serial number 5831-10 / 88-080. The BHP HBI plant is in the distance on the left. September 2001.
|
|

255-12343 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
|
|

255-22343 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.
|
|

255-32343 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.
|
|

256-03343 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

256-06343 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.
|
|

256-08343 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.
|
|

257-07343 viewsFlash Butt yard BHP's stored Goninan WA ALCo C636 to GE C36-7M rebuild unit 5506 awaits its fate. Rebuilt in 1987 at Goninan's Welshpool factory from a 1968 AE Goodwin built ALCo C636 with serial number G6012-4 and road number 5455 and assigned new serial number 4839-01 / 87-071. It was delivered in Mount Newman Mining orange and was named Mt Goldsworthy. 5506 was the first unit in the world where an ALCo C636 had been rebuilt into an GE C36-7. Late 2001.
|
|

257-09343 viewsFlash Butt yard Mount Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW awaits its fate. Late 2021.
|
|

257-27343 viewsGoldsworthy Junction, an empty train runs between the junction and the Broome Rd crossing behind the standard single locomotive 5646 'White Springs', a Goninan 1992 built GE CM40-8 model with serial number 5244-11 / 92-135. The four styles of waggon in use are visible, behind the loco are three Golynx waggons, then a number of Gunderson USA builds, the ribbed type is a Portec USA built and then following are the Tomlinson WA and Scotts of Ipswich built 70 ton waggons. Late 2001.
|
|

268-04343 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
174 |  |
 |
 |
 |
 |
 |
 |
|