Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0409.jpg
250501 0409327 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2057 - GA 2058, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0433.jpg
250501 0433327 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2687 - GA 2688, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0554.jpg
250501 0554327 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2931 - GA 2932, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
200412_6177.jpg
200412 6177327 viewsBoodarie, part of a loaded FMG train, painted ore waggon pair 7687 - 8688 built by CRRC Yangtze Rolling Stock Co. of China in 2018, 7687 waggon view, it features mural painting by students of South Hedland High School and was painted in August 2018. April 12, 2020.
210322_9575.jpg
210322 9575326 viewsNear Gecko on Rio Tinto's Dampier - Tom Price line is Chinese built ballast waggon BAH 091 on a loaded ballast rake. Location is roughly here. 22nd March 2021.
253-07.jpg
253-07326 viewsPort Hedland harbour sees the suction / cutter dredge Vlaanderen XI with IMO #7712080. The Vlaanderen XI was originally built in 1978 by IHC Dredgers with yard number 1108 and originally named New Amsterdam, named the Vlaanderen XI in 1986, renamed again in 2007 to Kaveri and again to Huta 15 in 2014.
255-17.jpg
255-17326 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.
257-15.jpg
257-15326 viewsFlash Butt yard, Locotrol I remote waggon 2626 which is modified from a Comeng ore waggon in the 1980s, Locotrol II remote waggon 661 modified from a Magor USA ore waggon in the late 1980s and Locotrol I remote waggon 2065 modified Comeng ore waggon in the 1980s. Late 2001.
258-07.jpg
258-07326 viewsNelson Point, Goninan GE rebuild C36-7M unit 5512 serial 4839-08 / 87-076 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. May 2002.
284-29.jpg
284-29326 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
080304_2173.jpg
080304 2173325 viewsThomas Yard, down the rail welding end, side view of slave waggon 1353, the yellow circle around the tare weight 22.6 t indicates the rotary coupler end, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
210510_1112.jpg
210510 1112325 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 008 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1113.jpg
210510 1113325 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTW 007 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
253-23.jpg
253-23325 viewsNelson Point hard stand, CFCLA CHRY type ballast hopper waggon CHRY 753.
254-27.jpg
254-27325 viewsBing Siding at the 20 km, an empty train departs south with Goninan rebuild unit 5668 'Dunkirk' an CM40-8MEFI model with serial number 8412-01 / 95-159, one of the last four rebuilds with an EFI 7FDL engine. It is trailing AC6000 unit 6071. September 2001.
255-23.jpg
255-23325 viewsWestern Creek, looking south alongside the Robe River interconnecting line with the Western Creek bridge, in the far background the pole line is the Hamersley Iron Dampier to Tom Price line. Geodata location here. May 2002.
256-18.jpg
256-18325 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
258-26.jpg
258-26325 viewsNelson Point, old Loc Prep. Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is waiting to be removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. May 2002.
284-08.jpg
284-08325 viewsNargulu yard, XW type grain hopper waggon XW 21848 built by Westrail Midland Workshops in a batch of eighty between 1978 and 1980, converted to XWA in 1984? The 'C' and the circular sight glass is for canola loading. November 8, 2004.
252-34.jpg
252-34324 viewsPort Hedland at 12 Mile Creek a loaded Yarrie train about the cross the Broome Rd at the 19.4 km behind Goninan CM40-8M GE rebuild unit 5645 'Sherlock' serial number 8281-11 / 92-134. Early December 2001.
6096 files on 305 page(s) 184

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional