Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
210510_1113.jpg
210510 1113158 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTW type intermediate rail waggon RTB 007 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1147.jpg
210510 1147158 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 006 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
258-30.jpg
258-30158 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068. Early May 2002.
258-19.jpg
258-19156 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
258-22.jpg
258-22156 viewsNelson Point, old Loco Prep, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. May 2002.
284-12.jpg
284-12156 viewsNarngulu yard looking north west towards the workshops from behind the Hamptons yard, location is roughly here. November 9, 2004.
250501_0550.jpg
250501 0550156 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2835 - GA 2836, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
284-28.jpg
284-28155 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
284-29.jpg
284-29155 viewsBing Siding, 18 km south of Nelson Point with a loaded train holding the mainline with newly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 as the second unit behind an AC6000. Late 2004.
210510_1143.jpg
210510 1143154 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 010 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
256-37.jpg
256-37153 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
284-03.jpg
284-03153 viewsPort Hedland, Nelson Point hard stand area, BHP Billiton EMD SD40R unit 3095 serial 33677 and originally Southern Pacific SD40 SP 8485 has just been unloaded, August 7, 2004.
081225_0570.jpg
081225 0570153 viewsBarker Siding, one of FMG's thirty five ballast waggons, BH 11, EP-60 brake valve and manual release view, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. December 25, 2008.
250501_0324.jpg
250501 0324152 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3197 - GA 3198, the first pair of the second batch and the first painted pink, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0547.jpg
250501 0547151 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2857 - GA 2858, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
269-04.jpg
269-04150 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
255-12.jpg
255-12149 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.
256-28.jpg
256-28149 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
250501_0308.jpg
250501 0308149 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2249 - GA 2250, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0543.jpg
250501 0543149 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2597 - GA 2598, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
4019 files on 201 page(s) 186

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional