Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250501_0624.jpg
250501 0624312 viewsThomas Yard, one of FMG's thirty five ballast waggons, BH 05, 100 tonne capacity, built in China by CSR at the Yangtze Rolling Stock Company in 2008. May 1, 2025.
258-34.jpg
258-34311 viewsNelson Point, Loco Overhaul Shop, Goninan WA rebuild CM40-8M unit 5645 'Sherlock' serial number 8281-11/93-134. Early May 2002.
284-09.jpg
284-09311 viewsNarngulu, Geraldton, former Westrail P class loco P 2003 'Shire of Victoria Plains' built by Goninan WA as a GE CM25-8 model with serial number 6320-02 / 90-088 sits in the yard on empty grain waggons with sister loco P 2014. November 9, 2004.
250501_0453.jpg
250501 0453311 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2321 - GA 2322, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0454.jpg
250501 0454311 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2617 - GA 2618, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
254-16.jpg
254-16310 viewsFlash Butt yard, stored line-up of the eight Goninan ALCo to GE rebuild C36-7M units, 5506 with serial number 4839-01 / 87-071. This was the first unit in the world to be built into a C36-7 from an ALCo C636 locomotive. It was rebuilt 1987 from AE-Goodwin built ALCo C636 numbered 5455 with serial number G6012-4.
256-14.jpg
256-14310 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.
256-15.jpg
256-15310 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.
284-07.jpg
284-07310 viewsNarngulu yard, XEB type hopper waggon XEB 24490 built by Westrail Midland Workshops in 1976 as part of a batch of forty-one XE type waggons for ilmenite cartage, and fitted with vacuum bypass pipes and recoded in ~1983 to XEB, seen here labelled for zircon traffic. November 8, 2004.
250501_0327.jpg
250501 0327310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2971 - GA 2972, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0365.jpg
250501 0365310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2829 - GA 2830, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0387.jpg
250501 0387310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3403 - GA 3404, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0389.jpg
250501 0389310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2905 - GA 2096, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
250501_0405.jpg
250501 0405310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3443 - GA 3444, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0519.jpg
250501 0519310 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2765 - GA 2766, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
210510_1139.jpg
210510 1139309 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 014 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
256-31.jpg
256-31309 viewsAt the 89.6 km grade crossing and with the meet at Maitland completed the loaded train continues onto Cape Lambert behind the quad CM40-8M working. May 2002.
256-37.jpg
256-37309 viewsAt the 89.6 km grade crossing the loaded Robe River waggons across the crossing. May 2002.
284-03.jpg
284-03309 viewsPort Hedland, Nelson Point hard stand area, BHP Billiton EMD SD40R unit 3095 serial 33677 and originally Southern Pacific SD40 SP 8485 has just been unloaded, August 7, 2004.
250501_0332.jpg
250501 0332309 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 2845 - GA 2846, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
6096 files on 305 page(s) 189

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional