Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
16942.jpg
16942164 viewsBassendean, Goninan GE CM40-8M rebuild unit for BHP Iron Ore 5653 'Chiba' serial 8412-10 / 93-144 sits out the back on shop bogies still under construction in the October 1993 image as Westrail P class loco P 2014 looks on.
Jim Bisdee photo.
197-08.jpg
197-08163 viewsGoldsworthy Junction, looking east, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081, note the CCTV camera mounted under the radiator wing.
151111_9507.jpg
151111 9507163 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
160128_00880.jpg
160128 00880163 viewsWedgefield, Sims Metal Yard, view of the ALCo Hi-Ad bogie shows the external coil secondary suspension.
041014_142128.jpg
041014 142128163 viewsPilbara Railways Historical Society, Comeng WA ALCo rebuild C636R locomotive 3017 serial WA-135-C-6043-04. The improved Pilbara cab was fitted as part of the rebuild in April 1985. Donated to Society in 1996. 14th October 2004.
197-06.jpg
197-06162 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
207-01.jpg
207-01162 viewsKoodaideri sign on the Wittenoom - Roy Hill Rd.
218-14.jpg
218-14162 viewsDe Grey River, a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine. Then the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
218-16.jpg
218-16162 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
218-17.jpg
218-17162 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
151111_9512.jpg
151111 9512162 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
240-23.jpg
240-23162 viewsWickham town entry statement, concrete plinth with plaque outlining the history of the MLW built ALCo model RSC3 units operated by Robe River prior to preservation and on the NSWGR as originally 40 class 4006. 31st August 2002.
180615_1407.jpg
180615 1407162 viewsBing Siding, BHP Billiton's Progress Rail built EMD model SD70ACe unit 4432 'Warlu' serial 20128866-001 leads a loaded towards the port. 15th June 2018.
180616_1662.jpg
180616 1662162 viewsCooya Pooya, instrumented ore waggon 1024, a Bradken built 'J' waggon with a build date from January 2006. The solar panels are mounted along each side. 16th June, 2018.
040412_144448.jpg
040412 144448162 viewsNelson Point, Comeng WA built ore waggon 2257 one of 183 waggons built in 1970. 12th April 2004.
040412_144554.jpg
040412 144554162 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon 4912 made from 5Cr12Ti stainless steel these waggons are known as Golynx waggons, part of Rake 3 of 120 waggon, build date 01/2004. 12th April 2004.
219-18.jpg
219-18161 viewsMunjina Gorge, original facilities at this lookout. The area has now changed and is known as the Albert Tognoli Rest Area these days.
151111_9491.jpg
151111 9491161 viewsNear the 38 km post, an empty train lead by General Electric ES44DCi units 8160 and 8193 serials 60224 and 61852 and General Electric Dash 9-44CW 7074 serial 47743 power under the water supply pipeline on the Cape Lambert line.
160128_00654.jpg
160128 00654161 viewsWedgefield, Sims Metal Yard, Goninan rebuilt GE model CM40-8M unit 5661 cab has had the drivers side torn out revealing the remains on the control stand.
240-27.jpg
240-27161 viewsSeven Mile, loaded train heading for Parker Point behind a pair of Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW units 9470 serial 53455 and 9471 serial 53456. These and sister unit 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
3610 files on 181 page(s) 21

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional