Most viewed - Pilbara negative and digital Albums - Iron Ore |

218-08207 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

240-27207 viewsSeven Mile, loaded train heading for Parker Point behind a pair of Pilbara Rail, Robe River owned, General Electric built Dash 9-44CW units 9470 serial 53455 and 9471 serial 53456. These and sister unit 9472 were the first painted in the Pilbara Rail livery. 31st August 2002.
|
|

180527 1208207 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP stored redundant service waggons, the two heavy weight waggons, the original Vickers Hoskins built 6004 137.1 tonne capacity Ortner Freight Car Company design, and the much newer Gemco WA built 100 tonnes capacity waggon. 27th May 2018. GeoData.
|
|

180614 1281207 viewsAllen Siding, at the 45 km looking west, the original rail or steel train is stowed on the mainline, looking from the rear lead off waggon 6203, built by Comeng WA in January 1977. The chute arrangement for the discharging and recovery of rail is visible. 14th June 2018. GeoData.
|
|

040409 121940207 viewsBoodarie, Goninan built Golynx waggon 8416 with serial number 950088-326 from November 2011, which is a modified version of the BHP mainline waggons for service on the Goldsworthy system as a bottom discharge waggon. 9th of April 2004.
|
|

040502 080108207 viewsBoodarie, Goninan built Golynx waggon 8408 which is a modified version of the BHP mainline waggons for service on the Goldsworthy system as a bottom discharge waggon. 2nd May 2004.
|
|

041225 064654207 viewsNelson Point Ore Car Repair Shops, brand new Bradken NSW built ore waggon 9101 asset number 2031703. These waggons are the latest additions to the fleet with 20 on order in total. They are made from the same 5Cr12Ti steel that the Goninan Golynx waggons are made. 25th December 2004.
|
|

150518 8123206 viewsBHP Iron Ore old and retired ore stacker #4 and bucket wheel reclaimer #4 are blown apart to aid in the scrapping process.
|
|

197-03205 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.
|
|

207-21205 viewsHardie Siding, BHP locomotive 5513 is the final member of Goninan rebuilds from ALCo C636 5453 into a GE C36-7M unit 5513 serial 4839-02 / 88-078, with 'Kalgan' nameboards removed for fitting to AC6000 class 6074, holds the main with a loaded Yarrie train awaiting a cross.
|
|

218-09205 viewsDe Grey River Bridge, a loaded Yarrie train crosses the river behind an original Mt Newman Mining ALCo to GE rebuild carried out by Goninan, originally ALCo C636 5458 to GE model C36-7M unit 5510 'Newman' serial 4839-07 / 87-075.
|
|

218-19205 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
|
|

080621 2722205 viewsTabba South, new Lead-Off Lead-On waggon STTR class STTR 6214 on the end of the Steel Train or rail recovery and transport train, built by Gemco Rail WA, the chutes can be seen standing up with the squeeze rollers behind the mesh.
|
|

170726 9434205 viewsKanyirri yard, a short FMG shunt train departs the yard and heads to the car dumper balloons behind Progress Rail built SD70ACe/LCi unit 702 serial 20118611-002 and ten pairs of ore waggons. 26th July 2017.
|
|

041014 122810205 viewsPilbara Railways Historical Society, Mancha battery hauler from the former CSR underground blue asbestos mine at Wittenoom, driving position is at the rear in this shot. Shows misspelling on the side of EXPRSS rather than express. Donated to the Society in 2003. 14th October 2004.
|
|

219-18204 viewsMunjina Gorge, original facilities at this lookout. The area has now changed and is known as the Albert Tognoli Rest Area these days.
|
|

180614 1331204 viewsAllen Siding, the points and what remains of the point machine at the 45 km for the siding, looking east. GeoData. 14th June 2018.
|
|

180614 1332204 viewsAllen Siding, recycled rail from the Newman Mainline, a section of rail from the 222.8 km between Shaw and Hesta has made its way to the 45 km on the Goldsworthy line. GeoData. 14th June 2018.
|
|

041014 122626204 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th October 2004.
|
|

150523 8253203 viewsFinucane Island, empty train heading back to Boodarie behind new Progress Rail EMD SD70ACe unit 4486 serial 20148001-019 and an older sibling 4459 serial 20138907-010. Geodata: -20.3366783 118.5496817 .
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
24 |  |
 |
 |
 |
 |
 |
 |
|