Most viewed - Pilbara negative and digital Albums - Iron Ore |

150523 8253450 viewsFinucane Island, empty train heading back to Boodarie behind new Progress Rail EMD SD70ACe unit 4486 serial 20148001-019 and an older sibling 4459 serial 20138907-010. Geodata: -20.3366783 118.5496817 .
|
|

232-36450 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

170727 9516450 viewsNelson Point, BHP empty fuel train sits in the middle yard waiting to shunt the waggons across to the gantry to be reloaded for their next run to the mine, behind Progress Rail Muncie USA built EMD unit SD70ACe/LCi 4468 serial 20148001-001 and eleven 100,000 litre tank waggons. 27th July 2017.
|
|

040412 144448450 viewsNelson Point, Comeng WA built ore waggon 2257 one of 183 waggons built in 1970. 12th April 2004.
|
|

151206 9656450 viewsBoodarie, on a Gavin Transport Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. Underbody detail of the testing units.
|
|

200914 7811450 viewsPilbara Railways Historical Society, the Locotrol 'cab' from Goninan WA rebuild CM40-8ML unit 5663 Newcastle, one of three units built without a driving cab in 1994 but with a Locotrol equipment cabinet to do away with the Locotrol waggons that were in use at the time. Eventually the three locomotives had driving cabs fitted. Donated to the Society around 1998? 14th September 2020.
|
|

197-01449 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.
|
|

170727 9627449 viewsWoodstock Siding, a Roy Hill ballast train works north as it is about to cross BHP's Woodstock running lines, General Electric Erie built model ES44ACi unit RHA 1006 serial 62578 leads a side dump, ten ballast hoppers and a ballast plough with a sister unit on the rear. 27th July 2017. GeoData.
|
|

170730 0500449 viewsIndee, empty Roy Hill train at the Indee Rd grade crossing at the 53.3 km with mid-train remote General Electric built ES44ACi unit RHA 1015 serial 63826. These mid-train units have 112 waggon before and after. 30th July 2017. GeoData.
|
|

060723 7841449 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

040407 080418449 viewsToy Titan on the lean when the LHS rear wheel parted company and went bush. 23 km Newman mainline. Wednesday 7th April 2004.
|
|

151206 9653449 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, behind a Gavin Transport Mack Titan 600 on a Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
|
|

200914 7757449 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by BHP 5502 serial C6096-7 built in July 1976, retired in 1994, donated to Society in November 1995. 14th September 2020.
|
|

268-13449 viewsAt the 39 km detection site with the Alstom 25-year service agreement special, BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 stands on the Newman mainline with The Sundowner and 5634 on the rear of the train as the party conducts an inspection of the site. Friday 12th of April 2002.
|
|

203-17448 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.
|
|

218-18448 viewsDe Grey River Bridge, a loaded GML train with the original AE Goodwin designed and Tomlinson Steel Perth and Scotts of Ipswich built waggons.
|
|

232-05448 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.
|
|

040412 144343448 viewsNelson Point, Comeng WA built ore waggon handbrake end view. 12th April 2004.
|
|

200412 5921448 viewsBoodarie, part of a loaded FMG train, a mismatched waggon pair, both are CSR Yangtze Rolling Stock Co. of China builds, 6968 would be a 2013 built, but the 5967 should be a 2014 build and numbered in the 72xx-74xx series. 12th April 2020.
|
|

160128 00875447 viewsWedgefield, Sims Metal Yard, reduced to just the front wall and the 7FDL-16 engine sticking above frame level, BHP Billiton Goninan rebuild CM40-8M locomotive 5661 serial 8412-06/94-152 is almost gone.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
27 |  |
 |
 |
 |
 |
 |
 |
|