Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
221-02.jpg
221-02384 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 holds the mainline with a loaded train bound for Finucane Island.
040407_080434.jpg
040407 080434384 viewsToy Titan had the LHS rear wheel part company and went bush at the 23 km on the Newman mainline, this is the scour mark. Wednesday 7th April 2004.
240-24.jpg
240-24384 viewsWickham town entry statement, concrete plinth with plaque outlining the history of the MLW built ALCo model RSC3 units operated by Robe River prior to preservation and on the NSWGR as originally 40 class 4006. 31st August 2002.
041225_064737.jpg
041225 064737384 viewsNelson Point Ore Car Repair Shop, original Magor USA built ore waggon 581, known as the 'Oro's', one of 144 built in 1963 and bought by the Mt Newman partners in 1968 from the Oroville Dam construction in California. 25th December 2004.
203-17.jpg
203-17383 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 powers its' train out of the passing track at Bing South.
150522_8183.jpg
150522 8183383 viewsWedgefield, Sims Metal yard, Goninan WA rebuild CM40-8M units 5638 serial 8281-02/92-127, 5640 serial 8281-05/92-129 and 5659 serial 8412-04/94-150, for full details of these units past lives see here .
040412_143532.jpg
040412 143532383 viewsNelson Point, Comeng WA built ore waggon 1760 one of 288 waggons built in 1974. 12th April 2004.
200412_5554.jpg
200412 5554383 viewsBoodarie, part of an FMG loaded train arriving at the port CNR (China Northern) QRRS (Qiqihar Rolling Stock Works) built waggon pair 7419 slave waggon and 8420 control waggon, with both waggons tared at 23.9 tonnes, the yellow circle on 7419 indicates the rotary coupler end. 12th April 2020.
197-07.jpg
197-07382 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train behind BHP's Goninan 1988 build GE CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081.
170727_9620.jpg
170727 9620382 viewsWoodstock Siding, a loaded BHP iron ore train passes under the Roy Hill overpass behind Progress Rail Muncie USA built EMD SD70ACe/LCi unit 4466 serial 20138907-017 and sister 4367. 27th July 2017. GeoData.
170727_9630.jpg
170727 9630382 viewsWoodstock Siding, a Roy Hill ballast train works north General Electric Erie built model ES44ACi unit RHA 1006 serial 62578 leads a side dump. 27th July 2017. GeoData.
21247.jpg
21247382 viewsBassendean, Goninan workshops, sitting on shop bogies out the back, BHP Iron Ore Goninan GE CM40-8ML - L for LocoTrol - rebuild unit 5664 serial 8412-09 / 94-155 was rebuilt without a cab and fitted with LocoTrol II from AE Goodwin ALCo M636 5469 serial G6047-1. September 1994.
Jim Bisdee photo.
180527_1207.jpg
180527 1207382 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.
040412_143253.jpg
040412 143253382 viewsNelson Point, Comeng WA built ore waggon 1714 one of 288 waggons built in 1974. 12th April 2004.
151206_9651.jpg
151206 9651382 viewsBoodarie, parked up in a parking bay just out of town on a Sunday awaiting delivery on the following day, on a Gavin Transport Drake float, BHP's new track recording vehicle which is a Mermec ROGER 800 imported from Italy. ROGER is an acronym for Rilievo Ottico Geometria Rotaia, Italian for optical rail geometry control.
200914_7773.jpg
200914 7773382 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th September 2020.
267-23.jpg
267-23382 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5634 'Boodarie' serial number 8151-07 / 91-120 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner and sister unit 5653. The realigned former Goldsworthy line to the Yarrie and Nimingarra mines can be seen curving away to the left in front of 5634. Friday 12th of April 2002.
223-13.jpg
223-13381 viewsPossum Siding, Hamersley Iron loco 7082 a General Electric built Dash 9-44CW serial 47761 leads sister unit 7080 with an empty train just inside the loop waiting to effect a crew change. 21st October 2000.
040409_122938.jpg
040409 122938381 viewsBoodarie, Goldsworthy service bottom discharge Portec USA built ore waggon 345 is one of ten that was purchased second hand in 1992 from Phelps Dodge Copper Mine, believed to be built in 1980s. 9th April 2004.
040412_144321.jpg
040412 144321381 viewsNelson Point, Goninan built, Lynx Engineering designed ore waggon known as Golynx waggons, one of 345 such waggons constructed during 2001 out of 3CR12 stainless steel in an effort to eliminate painting and to reduce wear on the waggon body. 12th April 2004.
6096 files on 305 page(s) 28

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional