Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
240701_2439.jpg
240701 243924 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31640 is a master and is bar coupled to slave waggon 36640 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
240701_2449.jpg
240701 244924 viewsWestern Creek, 67 km, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31674 is a master and is bar coupled to slave waggon 36674 built by China Northen as a Q type in 11/2022. Captured on July 1, 2024.
0917_170513_8674.jpg
0917 170513 867423 viewsRobe River ore waggon 917, built by Centurion Industries WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0248_180616_1716.jpg
0248 180616 171623 viewsRobe River ore waggon 248, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0309_210322_9718.jpg
0309 210322 971823 viewsRobe River ore waggon 309, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0585_210322_9763.jpg
0585 210322 976323 viewsRobe River ore waggon 585, built by Tomlinson Steel WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
0672_180616_1723.jpg
0672 180616 172323 viewsRobe River ore waggon 672, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0726_180616_1739.jpg
0726 180616 173923 viewsRobe River ore waggon 726, built by Tomlinson Steel WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0785_180616_1650.jpg
0785 180616 165023 viewsRobe River ore waggon 785, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view at the 38.5 km, Harding on the Cape Lambert line, June 16, 2018.
0789-1019_210322_9795.jpg
0789-1019 210322 979523 viewsRobe River ore waggon 786, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view, comparison with Bradken style waggon, at the 17 km on the Cape Lambert line, March 22, 2021.
0825_180616_1718.jpg
0825 180616 171823 viewsRobe River ore waggon 825, built by Centurion Industries WA, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0931_180616_1875.jpg
0931 180616 187523 viewsRobe River ore waggon 931, built by Centurion Industries WA, fixed coupler handbrake side loaded view at Maitland Siding on the Deepdale line, June 16, 2018.
1019_210322_9796.jpg
1019 210322 979623 viewsRobe River ore waggon 1019, built by Bradken Rail Qld in January 2006, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1071_210322_9774.jpg
1071 210322 977423 viewsRobe River ore waggon 1071, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1079_180616_1706.jpg
1079 180616 170623 viewsRobe River ore waggon 1079, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1082_210322_9727.jpg
1082 210322 972723 viewsRobe River ore waggon 1082, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
1083_180616_1734.jpg
1083 180616 173423 viewsRobe River ore waggon 1083, built by Bradken Rail Qld in May 2012, rotary coupler end non-handbrake side empty view, at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
1104_210322_9752.jpg
1104 210322 975223 viewsRobe River ore waggon 1104, built by Bradken Rail Qld in April 2012, rotary coupler end non-handbrake side loaded view, at the 17 km on the Cape Lambert line, March 22, 2021.
IC20-CB07_240619_0320.jpg
IC20-CB07 240619 032023 viewsRobe River compressor waggon CB07 was originally IC 20 with air receiver. These waggons were ballasted to 100 tonnes each and are modified ore waggons and used for CD2 DUMPING ONLY. Cape Lambert yard June 19, 2024.
IC23-CB08_210510_0922.jpg
IC23-CB08 210510 092223 viewsRobe River compressor waggon set CB08, was originally IC 23 with two Kaesir air compressors. These waggons were ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert yard May 10, 2021.
6096 files on 305 page(s) 296

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional