Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
240619_0384.jpg
240619 0384233 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31503 is a master and is bar coupled to slave waggon 36503 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
240619_0395.jpg
240619 0395233 viewsCape Lambert yard, one of Rio Tinto's blue rakes with spring assisted park brake and only electronic controlled pneumatic [ECP] braking, waggon pair 31555 is a master and is bar coupled to slave waggon 36555 built by China Northen as a Q type in 12/2022. Captured on June 19, 2024.
0617_160306_1480.jpg
0617 160306 1480232 viewsRobe River ore waggon 617, built by Tomlinson Steel WA, fixed coupler handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
1027_160727_0959.jpg
1027 160727 0959232 viewsRobe River ore waggon 1027, built by Bradken Rail Qld in January 2006, rotary coupler end handbrake side empty view at Harding Siding on the Cape Lambert line, July 27, 2016.
1027_160727_0960.jpg
1027 160727 0960232 viewsRobe River ore waggon 1027, built by Bradken Rail Qld in January 2006, rotary coupler end handbrake side empty partial view at Harding Siding on the Cape Lambert line, July 27, 2016.
0116_180616_1698.jpg
0116 180616 1698232 viewsRobe River ore waggon 116, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
0902_180616_1681.jpg
0902 180616 1681232 viewsRobe River ore waggon 902, built by Centurion Industries WA, non-handbrake side loaded view at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
9589-10590_230122_4425.jpg
09589-10590 230122 4425232 viewsFMG 9589 and 10590 on a loaded train at Boodarie, January 22, 2023. Twenty pairs, or forty waggons numbered 9551 slave and 10552 control, up to 9589 slave and 10590 control built by CRRC Qiqihar in 2021 with the CNR style body and yellow ends denoting dual rotary coupler waggons.
0672_041014_154200.jpg
0672 041014 154200231 viewsRobe River ore waggon 672, built by Tomlinson Steel WA, rotary coupler end handbrake side empty view, Cape Lambert yard. 1542 hours, October 14, 2004.
0653_160306_1643.jpg
0653 160306 1643231 viewsRobe River ore waggon 653, built by Tomlinson Steel WA, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0904_170513_8697.jpg
0904 170513 8697231 viewsRobe River ore waggon 904, built by Centurion Industries WA, rotary coupler end handbrake side loaded view, Cape Lambert yard, May 13, 2017.
0903_210322_9684.jpg
0903 210322 9684231 viewsRobe River ore waggon 903, built by Centurion Industries WA, rotary coupler end non-handbrake side loaded view at the 17 km on the Cape Lambert line, March 22, 2021.
5001-6002_140806_5154.jpg
05001-06002 140806 5154231 viewsFMG 5001 and 6002 at Wodgina Rd on an empty train, August 6, 2014. Stencilled numbers suggest renumbered on delivery, 5003 and 6004 also had stencilled numbers. Follow on order for 744 waggons 5001 slave and 6002 control, up to 5743 slave and 6744 control built by CNR QRRS Qiqihar Railway Rolling Stock Co. Ltd.
7029-8030_200410_5208.jpg
07029-08030 200410 5208230 viewsFMG 7029 and 8030 at Boodarie on an empty train, April 10, 2020. 282 waggons numbered 5747 slave and 6748 control, up to 7029 slave and 8030 control built by CSR Yangtze Rolling Stock Co., Ltd. in 2013.
0947_180616_1680.jpg
0947 180616 1680229 viewsRobe River ore waggon 947, built by Centurion Industries WA, fixed coupler non-handbrake side loaded view at the 33.7 km, Arches on the Cape Lambert line, June 16, 2018.
1055_141124_6754.jpg
1055 141124 6754228 viewsRobe River ore waggon 1055, built by Bradken Rail Qld in March 2012, fixed coupler handbrake side view, upside down following derailment near the 11.7 km grade crossing, Cape Lambert. November 24, 2014.
1094_160306_1524.jpg
1094 160306 1524228 viewsRobe River ore waggon 1094, built by Bradken Rail Qld in April 2012, fixed coupler non-handbrake side loaded view, at the 45 km, Harding Siding on the Cape Lambert line. March 6, 2016.
0310_180616_1742.jpg
0310 180616 1742228 viewsRobe River ore waggon 310, built by Nippon Sharyo Nihon, rotary coupler end non-handbrake side empty view at the 38 km, Harding on the Cape Lambert line, June 16, 2018.
5743-6744_200412_5957.jpg
05743-06744 200412 5957228 viewsFMG 5743 and 6744 at Boodarie on an empty train, April 12, 2020. Follow on order for 744 waggons 5001 slave and 6002 control, up to 5743 slave and 6744 control built by CNR QRRS Qiqihar Railway Rolling Stock Co. Ltd.
0755_110602_1664.jpg
0755 110602 1664226 viewsRobe River ore waggon 755, built by Centurion Industries WA, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
6389 files on 320 page(s) 305

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional