Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images. **Note - Due to recent changes to make the gallery mobile friendly, please click the image for full size picture.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
2800_Comeng_041001_165104.jpg
2800 Comeng 041001 165104114 viewsRedbank, loaded BHP Iron Ore waggon 2800, a Comeng WA original build from the fifth order in 1971, the Yandi loadout must has had a glitch hence the odd loading profile. October 1, 2004.
4769_UG_040911_124352.jpg
4769 UG 040911 124352114 viewsNelson Point, builders plate on BHP Iron Ore waggon 4769, a United Goninan Golynx build from September 2003 with serial number 950115-050. September 11, 2004.
275-11.jpg
275-11114 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' departs the service road on its way to Yarrie with an empty, on the far left the HBI beneficiation plant is visible. The loaded is running down the mainline towards Finucane Island. This scene has changed immensely since August 10, 2003.
1091_UG_110414_0110.jpg
1091 UG 110414 0110113 viewsBoodarie, loaded BHP ore waggon 1091, a United Goninan replacement for an original Comeng numbered waggon. April 14, 2011.
2355_UG_110414_0111.jpg
2355 UG 110414 0111113 viewsBoodarie, loaded BHP Iron Ore Waggon 2355, a United Goninan WA replacement body built May 2009. Has original Comeng build 2410s undergear. April 14, 2011.
3438_Goninan_110414_0122.jpg
3438 Goninan 110414 0122113 viewsBoodarie, loaded BHP Iron Ore waggon 3438, a Goninan 3Cr12 type flat floor built from November 1997 with asset number 802374. April 14, 2011.
2557_Comeng_040815_170526.jpg
2557 Comeng 040815 170526113 viewsBHP Iron Ore waggon 2557 builders plate, a Comeng WA build from the fourth batch built in 1970. August 15, 2004.
1664_050110_162922.jpg
1664 050110 162922113 viewsDugite Siding, Robe River empty Bradken built S series control waggon 1664 with a build date of December 2001. January 10, 2005.
1821-6805_050828_5065.jpg
1821-6805 050828 5065113 viewsTunkawanna, empty Hamersley Iron Bradken built S series waggon pair 1821 control and 6805 slave built in February 2003. August 28, 2005.
3113-7167_050828_5085.jpg
3113-7167 050828 5085113 viewsTunkawanna, loaded Hamersley Iron Bradken built S series waggon pair 3113 control and 7167 slave built in December 2003. August 28, 2005.
275-09.jpg
275-09113 viewsBoodarie, BHP Iron Ore's 5645 'Sherlock' departs the service road on its way to Yarrie with an empty. The loaded is running down the mainline towards Finucane Island. This scene has changed immensely since August 10, 2003.
FC_160306_1364.jpg
FC 160306 1364112 viewsRobe River flat waggon. Greenpool March 6, 2016.
1354_Comeng_040804_155931.jpg
1354 Comeng 040804 155931112 viewsNelson Point, empty BHP ore waggon 1354 is a Comeng WA build from a batch of two hundred and twenty-six in 1973/74. Waggon has been resheeted with new side walls, shows end profile with square edges. August 4, 2004.
3359-7434_050109_134840.jpg
3359-7434 050109 134840112 views7 Mile, empty Robe River Bradken built S series waggon pair 3359 control and 7434 slave built in September 2004 arriving back from the unloader at Parker Point. January 9, 2005.
275-25.jpg
275-25112 viewsFinucane Island, Gunderson USA built smooth sided hopper waggons 8307, 333 and 8334, these waggons were sourced second hand in 1992 from Phelps Dodge copper. August 10, 2003,
275-33.jpg
275-33112 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Goldsworthy to Finucane Island railway, then ore trains and then the daily supply train once the A class arrived. August 10, 2003.
3279-7377_050828_5452.jpg
3279-7377 050828 5452111 viewsRosella Siding and start of the soon to be duplicated double track section, on the rear of a loaded train is Robe River Bradken built S series waggon pair 3279 control and 7377 slave with a build date of August 2004. August 28, 2005.
3302-7362_050828_5061.jpg
3302-7362 050828 5061111 viewsTunkawanna, empty Robe River Bradken built S series waggon pair 3302 control and 7362 slave built in July 2004. August 28, 2005.
BH038_050828_5381.jpg
BH038 050828 5381111 viewsRosella Siding, loaded Hamersley Iron ballast hopper waggon BH 038, built by Nippon Sharyo Japan in April 1969. August 28, 2005.
2869_Comeng_WA_110414_0113.jpg
2869 Comeng 110414 0113110 viewsBoodarie, loaded BHP Iron Ore waggon 2869, a Comeng WA original build from 1971 that has been resheeted. April 14, 2011.
6389 files on 320 page(s) 317

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Australian flag  Valid XHTML 1.0 Transitional