Most viewed - Pilbara negative and digital Albums - Iron Ore |

22452309 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state. This unit was subsequently scrapped. November 1992.
Jim Bisdee photo.
|
|

6983 001309 viewsWelshpool, Goninan Open Day 27th August, 1988. View of the assembly floor area, brand new GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 under construction for Mt Newman Mining masked up ready for painting with sister unit 5632 inline behind it.
Jim Bisdee photo.
|
|

150619 9164309 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
|
|

200914 7759309 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

197-03308 viewsGoldsworthy Junction, looking west with the end of the triangle or wye, signal post is GJ 7, empty iron ore train on approach.
|
|

170729 0119308 viewsGreen Pool, as they cross the #6 bridge on the original Robe River line with their train snaking all the way back to Western Creek, General Electric built ES44DCi unit 8114 serial 59106 in original silver livery and operating in AutoHaul™ with later sister units 8120 and 8148 with a loaded train from Yandicoogina. 29th July 2017. GeoData.
|
|

242-30308 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view looking into driving cab. May 2002.
|
|

041014 142704308 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th October 2004.
|
|

219-22306 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the mainline, the waggon behind 5507 is numbered 352 and is one of ten Portec USA built waggons originally from Phelps Dodge Copper Mine.
|
|

160128 00876306 viewsWedgefield, Sims Metal Yard, the almost unmarked front of Goninan rebuilt GE model CM40-8M unit 5661, serial 8412-06, builders no. 94-152 is surrounded by the twisted scrap that earlier formed the rest of the locomotive.
|
|

040419 102228306 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, 3/4 view from non-handbrake end, shows access ladder profiles, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

040502 085554306 viewsMooka Siding, trailing view of the 'Pony' heading south, 50 ton waggon 6701, one of three 'special' waggons converted from Magor USA built ore waggons, loaded with concrete sleepers is in the middle with former Goldsworthy flat waggon 8704 closet to camera.
|
|

20846306 viewsBassendean, Goninan workshops, newly completed BHP Iron Ore CM40-8M rebuild unit 5637 'De Grey' serial 8181-01 / 92-123 sits on a Bell road transport float bound for Port Hedland. 5637 was rebuilt from AE Goodwin ALCo C636 unit 5456 serial G6012-5. January 1992 image.
Jim Bisdee photo.
|
|

240-11306 viewsWickham, town entry statement with former Robe River Iron Associates Montreal Locomotive Works built ALCo model RSC3 serial 77737 of 1951, originally owned by New South Wales Railways as their 40 class 4006, to Robe River in 1971 as 261.001, then 1700 and finally 9401. Short hood end view on the rail plinth at the entry into town. 31st August 2002
|
|

242-09306 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

200914 7779306 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSC-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
|
|

050414 0936305 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172. 14th April 2005.
|
|

19798305 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, close up of front pilot. Sept 2003.
Jim Bisdee photo.
|
|

200914 7792305 viewsPilbara Railways Historical Society, MT 2 a type of shunters float on an old NSWGR four wheel underframe. 14th September 2020.
|
|

222-06304 viewsGreen Tank Pool, Pilbara, Western Australia.
Geo Data.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
33 |  |
 |
 |
 |
 |
 |
 |
|