Most viewed - Pilbara negative and digital Albums - Iron Ore |

220-10284 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Hedland.
|
|

222-03284 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train approaches behind two General Electric AC6000 units built by GE at their Erie plant, BHP 6071 serial 51063 leads sister unit 6074, 6071 has not been named as yet. This road was also the original road into Lynas Find Gold Project, back in the day. GeoData.
|
|

222-08284 viewsGreen Tank Pool, Pilbara, Western Australia. Geo Data.
|
|

222-12284 viewsFlat tyre on the BHP access road, the off cut of rail is used to get the axle high enough to fit the factory jack under it, Oh What a Feeling…
|
|

222-15284 viewsLalla Rookh gold mine head frame at sunset.
In the 1924 WA Mines Department report, it states there was a ten head battery and five cyanide vats for leaching located here GeoData.
|
|

151111 9560284 viewsGreen Pool, a loaded train holds the East Mainline behind triple General Electric ES44DCi units 8169, 8128 and 8163, serials of 60462, 59120 and 60227, the east line was booked out to track work between Green Pool and Harding.
|
|

150523 8265284 viewsFinucane Island, empty train heading back to Boodarie behind Progress Rail EMD SD70ACe unit 4379 serial 20108424-006 and a newly arrived and named sibling 4474 'Raymond White' serial 20148001-007. Geodata: -20.3341700 118.5504083 .
|
|

232-33284 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

232-34284 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

040806 102832284 viewsFlash Butt yard, rear view of stored out of service LocoTrol waggons, 2626 closest to camera, then 661, 2065 and 2703 Test Car.
|
|

050624 3337284 viewsGoldsworthy, Dash 8 locomotive 5636 with the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

170728 09805284 viewsEmu Siding, a loaded train rolls down grade at the 81 km West Mainline behind Rio Tinto stripe liveried General Electric built ES44DCi unit 8144 serial 58725 and sister and final unit 8199 and a Dash 9-44CW stablemate 9403. 28th July 2017. GeoData.
|
|

170730 0482284 viewsIndee, a loaded FMG iron ore train crosses Indee Rd grade crossing at the 48 km as it runs to the port behind NS Juniata Shops rebuild EMD SD90MAC-H unit 903 serial 976833-18 and General Electric built Dash 9-44CW class leader unit 001. 903 had the 245-H engine replaced with a 710 in 2014. The line to the right is the Roy Hill line. 30th July 2017. GeoData.
|
|

22662284 viewsBassendean, during an Open Day at the Goninan workshops, a GE CM40-8M rebuild under way within the workshops, possibly 5635. 20th July 1991.
Jim Bisdee photo.
|
|

23904284 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
|
|

170915 0713284 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1009 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
|
|

170915 0716284 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1002 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
|
|

180615 1507284 viewsIndee Station road grade crossing 53.3 km, loaded Roy Hill train behind General Electric built ES44ACi model RHA 1007 serial 62579 and sister unit RHA 1010 with the mid-train units visible in the distance. GeoData. 15th June 2018.
|
|

6989 001284 viewsWelshpool, Goninan Open Day 27th August, 1988. Mt Newman Mining's Goninan new build GE CM39-8 model loco 5630 'Zeus' serial 5831-09 / 88-079.
Jim Bisdee photo.
|
|

070622 0224284 viewsMooka in the back track siding, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
43 |  |
 |
 |
 |
 |
 |
 |
|