Most viewed - Pilbara negative and digital Albums - Iron Ore |

050801 4737396 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper. 1st August 2005.
|
|

080621 2711396 viewsTabba South, rail recovery and transport train, flat waggon 665, a cut down Magor USA built former Oroville Dam 91 ton ore waggon, used as the crib waggon on the steel train.
|
|

19800396 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, front on view of cab remains. Sept 2003.
Jim Bisdee photo.
|
|

23731396 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
|
|

240-06396 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits with the hood removed exposing the ALCo 251F engine end and turbo charger arrangement. 25th June 2002.
|
|

180615 1497396 viewsMooka Yard, cab side of named BHP's Progress Rail built EMD SD70ACe unit 4486 'Jenny Parkinson' serial 20148001-019. 15th June 2018.
Roland Depth photo.
|
|

180616 1758396 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 9431 with serial 54241 a GE Erie built GE model Dash 9-44CW from the 6th order in ROBE Pilbara Rail livery, this unit was from the sixth order of Dash 9-44CW units built at GE Erie in July 2003. 16th June 2018.
|
|

180616 1635396 viewsHarding Siding, a loaded train from Mesa A behind double Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 with 167 'J' type ore waggons rounds the curve at the 38.5 km grade crossing. 16th June 2018. GeoData
Toad Montgomery image.
|
|

150619 9092396 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, grinding and driving cab unit. Driving cab, filter and blower housings, shows domestic type split air conditioner for cab cooling.
|
|

200914 7810396 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by BHP 5502 serial C6096-7 built in July 1976, retired in 1994, donated to Society in November 1995. 14th September 2020.
|
|

247-18396 viewsCape Lambert, Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here dragging a loaded 101 waggon rake down to the car dumper from the South Yard at Bells Crossing. Approximate location of train is here. 22nd May 2002.
|
|

218-36395 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 and 7090 idle away waiting their next loaded train to push out.
|
|

220-18395 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

151111 9580395 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
|
|

150518 8143395 viewsBHP Iron Ore old and retired ore stacker #4 and bucket wheel reclaimer #4 are blown apart to aid in the scrapping process.
|
|

060414 3458395 viewsNelson Point yard, empty fuel tank waggon 0015, view of B end and bogie, a Comeng WA built 116 kilolitre tank waggon, one of a batch of six built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

060724 7865395 viewsOriginal Hamersley Iron compressor waggon set IC-1 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
|
|

5942 001 Welshpool 1986Sept395 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5452 serial G6012-1 built by AE Goodwin in May 1968 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In the September 1986 view the process has started and it is on shop bogies, by July 1987 it would become 5509. Sept 1986.
Jim Bisdee photo.
|
|

6995 001 Welshpool 19880819395 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
|
|

22665395 viewsBassendean, during an Open Day at the Goninan workshops, a new 'Pilbara' cab under construction which will be fitted to a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
46 |  |
 |
 |
 |
 |
 |
 |
|