Most viewed - Pilbara negative and digital Albums - Iron Ore |

221-12145 viewsHardie Siding, with the switch now set for the siding, the empty train is reversing out back onto the mainline, the ore cars are Tomlinson Steel built bottom discharge units.
|
|

150523 8215145 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034 with safety slogan 'Thank Safe + Work Safe = Go Home Safe', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

232-33145 viewsYandi One balloon loop cab-less BHP Goninan GE rebuild CM40-8ML (L for LocoTrol) 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid train consist about to enter the tunnel on the 18th of February 1997. This loco was built cab-less to control remote consists and here is in use as a slave, being controlled by a unit with a cab. GeoData.
|
|

040419 102145145 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of non-handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
|
|

6997 001 Welshpool 19880819145 viewsWelshpool, Goninan workshops, under construction Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079, 19th August 1988 image.
Jim Bisdee photo.
|
|

240-14145 viewsWickham, right hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

240-15145 viewsWickham, right hand side number two end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

080116 1364145 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
|
|

200914 7770145 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th September 2020.
|
|

200914 7820145 viewsPilbara Railways Historical Society, three four wheel waggons from the Point Samson PWD. All the PWD stock was of 3' 6" gauge. 14th September 2020.
|
|

219-28144 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train along the siding for a meet.
|
|

220-12144 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.
|
|

220-13144 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.
|
|

222-04144 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train departing behind two General Electric AC6000 units built by GE at their Erie plant. Gillam Siding is at the 97.1 km. GeoData.
|
|

222-19144 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie.
|
|

151111 9560144 viewsGreen Pool, a loaded train holds the East Mainline behind triple General Electric ES44DCi units 8169, 8128 and 8163, serials of 60462, 59120 and 60227, the east line was booked out to track work between Green Pool and Harding.
|
|

150523 8247144 viewsNelson Point Yard, loaded ore waggon 0967, a CNR built QRRS style waggon built in 2012 out of T4003 stainless steel which does away with the need to paint the waggon interiors to prevent wear. The white circle around the corner from the number indicates the rotary coupler end, the number for this waggon also indicates it is filling a gap in the original waggon numbers. Capacity 138.4 T, Tare 21.6 T and Volume 62 m3.
|
|

170730 0470144 viewsBoodarie, a loaded Roy Hill train approaches the Great Northern Highway grade crossing behind General Electric built ES44ACi units RHA 1013 serial 62585 and sister unit RHA 1014, the third and mid-train unit can be made out at the end of the rack as it curves. 30th July 2017. GeoData.
|
|

23711144 viewsBassendean, Goninan workshops, 'on loan' the ARHS B class shunt engine is coupled to Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5472 serial G6047-4 undergoing rebuilding into a GE CM40-8M unit, 5472 would emerge rebuilt as 5651 in August 1993. December 1992.
Jim Bisdee photo.
|
|

23760144 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
|
|
3720 files on 186 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
48 |  |
 |
 |
 |
 |
 |
 |
|