Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
23907.jpg
23907144 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 ALCo 251 prime mover, being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
242-23.jpg
242-23144 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
242-33.jpg
242-33144 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view of cab roof. May 2002.
6981_001.jpg
6981 001144 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 being built for Mt Newman Mining, masked up ready for painting.
Jim Bisdee photo.
080621_2803.jpg
080621 2803144 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
150619_9163.jpg
150619 9163144 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
200914_7762.jpg
200914 7762144 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
200914_7802.jpg
200914 7802144 viewsPilbara Railways Historical Society museum, former Cliffs Robe River Iron Associates RSC-3 model ALCo locomotive built by Montreal Locomotive Works (MLW) in 1951 for NSWGR as the 40 class 4002 serial 77733, purchased by CRRIA in 1971 and numbered 261.002, then 1705 and finally 9405. 4002 is preserved in an operational state and another claim to fame is it run the Royal Train in NSW February 1954. Donated to the Society in 1979. 14th September 2020.
220-20.jpg
220-20143 viewsGoldsworthy Junction, looking north east along the Goldsworthy line as a loaded train ex Yarrie mine approaches rounding the curve, the grease pot for the curve behind the photographer is visible.
223-33.jpg
223-33143 viewsPossum Siding, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo with the crew change completed, the empty is rolling past on the passing track. 21st October 2000.
150523_8229.jpg
150523 8229143 viewsNelson Point Yard, I Area, waggon scrapping by Sims Metal, Goninan rebuild CM40-8M 5665 shunts the waggons, its life also about to come to an end.
040419_102104.jpg
040419 102104143 viewsAbydos back track, riveted flat waggon 202 with three water tanks fitted, view of handbrake end, originally part of the 'camp train', modified by Mt Newman Mining railway workshops.
060414_3446.jpg
060414 3446143 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon with an axle load of 20 ton.
5944_001_Welshpool_1987April.jpg
5944 001 Welshpool 1987April143 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5453 serial G6012-2 built by AE Goodwin in 1969 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In this April 1987 view the process has started with the bogies and fuel tank removed. By February 1988 it would be the final C36-7M built for Mt Newman Mining as 5513. April 1987.
Jim Bisdee photo.
5945_001_Welshpool_1987April.jpg
5945 001 Welshpool 1987April143 viewsWelshpool, Goninan workshops, Mt Newman Mining C636 ALCo unit 5453 serial G6012-2 built by AE Goodwin in 1969 is undergoing a world first as it gets rebuilt into a GE C36-7M locomotive. In this April 1987 view the process has started with the bogies and fuel tank removed. By February 1988 it would be the final C36-7M built for Mt Newman Mining as 5513. April 1987.
Jim Bisdee photo.
242-10.jpg
242-10143 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
242-15.jpg
242-15143 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
6980_001.jpg
6980 001143 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5632 serial 5831-11 / 88-081 being built for Mt Newman Mining.
Jim Bisdee photo.
070622_0224.jpg
070622 0224143 viewsMooka in the back track siding, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white.
150619_9162.jpg
150619 9162143 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
3720 files on 186 page(s) 49

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional