Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050801_4741.jpg
050801 4741199 viewsFlash Butt yard, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper. 1st August 2005.
170729_0415.jpg
170729 0415199 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.
23884.jpg
23884199 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is lifted up with the Bell road transport float being prepped underneath for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
23885.jpg
23885199 viewsBassendean, Goninan workshops, BHP Iron Ore GE CM40-8M rebuild unit 5649 'Pohang' serial 8412-07 / 93-140 is lifted up with the Bell road transport float being prepped underneath for road haulage to Port Hedland. 5649 was rebuilt from AE Goodwin ALCo M636 unit 5473 serial G6047-5. July 1993.
Jim Bisdee photo.
170915_0721.jpg
170915 0721199 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1004 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
242-29.jpg
242-29199 viewsPort Hedland, Don Rhodes Mining Museum, preserved Goldsworthy Mining B class unit #2 serial number A-105, these units of Bo-Bo design with a 6CSRKT 640 kW prime mover were built at the English Electric Rocklea Qld plant in 1965 and primarily used for the construction of the Mt Goldsworthy to Finucane Island railway. May 2002.
180615_1607.jpg
180615 1607199 viewsWalla Siding, BHP ballast waggon 0207 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.
180616_1635.jpg
180616 1635199 viewsHarding Siding, a loaded train from Mesa A behind double Rio Tinto loco 9103 with serial 61941 a GE Erie built GE model ES44ACi from the 1st order in Rio Tinto Stripes livery and 9108 serial 62539 with 167 'J' type ore waggons rounds the curve at the 38.5 km grade crossing. 16th June 2018. GeoData
Toad Montgomery image.
6981_001.jpg
6981 001199 viewsWelshpool, Goninan Open Day 27th August, 1988. View from No.2 end of under construction GE CM39-8 locomotive 5631 serial 5831-10 / 88-080 being built for Mt Newman Mining, masked up ready for painting.
Jim Bisdee photo.
150619_9162.jpg
150619 9162199 viewsWalla back track, BHP track machine Tamper 3 a Plasser Australia unit model 09-3X serial M480. 19th June 2015.
200914_7805.jpg
200914 7805199 viewsPilbara Railways Historical Society, monument for the dedication of Hamersley Iron rail maintenance camp 'Camp Curlewis', the camp closed in November 1987. 14th September 2020.
246-18.jpg
246-18199 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
228-10.jpg
228-10198 viewsYandi Two mobile machine parking bay, a new water cart for Henry Walker, operator of the BHP owned mine, WC201 is based on a Caterpillar 777B truck chassis.
150523_8223.jpg
150523 8223198 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0037 with safety slogan 'Safety is a core value', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150523_8230.jpg
150523 8230198 viewsNelson Point Yard, wide view across BI-LO Crossing, a throw back to days that the supermarket was in fact a BI-LO, well before the current Woolworths, and Action before that. Dash 8 units in the yard, on the 5642 with the Steel Train and 5648 with another on a rake of index waggons.
239-21.jpg
239-21198 viewsView from the north western side of the Yandi One ROM (run of Mine) bin showing the operators cabin, Transmin rock breaker, conveyor CV2 running up hill to the left and Sub-Station 1 and the Yandi office complex beyond that on the hill. GeoData.
040407_073240.jpg
040407 073240198 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 tamper serial 153172, 7th April 2004.
040407_073334.jpg
040407 073334198 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line. 7th April 2004.
22664.jpg
22664198 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
23904.jpg
23904198 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
4019 files on 201 page(s) 56

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional