Most viewed - Pilbara negative and digital Albums - Iron Ore |

080621 2803473 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
|
|

150619 9096473 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left blower fans and filter housing, 5000 litre water tank, 2500 litre water tank, electrical cabinet, grinding hoods each side of bogie.
|
|

150619 9097473 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left filter housing, 5000 litre water tank, 2500 litre water tank, electrical cabinet, blower fans and filter housing, grinding hoods beside bogie.
|
|

200914 7807473 viewsPilbara Railways Historical Society, former ALCo built demonstrator locomotive model C-415 serial 3449-1 built April 1966, currently carrying number 1000, it was originally numbered 008 when Hamersley Iron purchased the unit in 1968. It was retired from service on the 24th February 1982. It then spent some time carrying number 2000 while building the Marandoo railway line from Sept 1991. 14th September 2020.
|
|

250-24473 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper as yard expansion works are underway to the left. 22nd October 2000.
|
|

210510 1136473 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 017 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

283-22473 viewsHarding Siding, quad Robe River CM40-8M units all rebuilt by Goninan from various ALCo models show their tank and bogie differences here. 9414, 9420, 9410 and 9425 lead 202 loaded ore waggons at Siding 1 (Harding). The siding has recently been renamed Harding and extended at the north end to accommodate the new West Angelas trains of up to 240 waggons. Wednesday 22nd May 2002.
|
|

221-17472 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, passes the Hardie Station 71 location cases and continues on the mainline bound for loading at Yarrie.
|
|

228-10472 viewsYandi Two mobile machine parking bay, a new water cart for Henry Walker, operator of the BHP owned mine, WC201 is based on a Caterpillar 777B truck chassis.
|
|

151111 9574472 viewsAn empty train is still struggling upgrade at the 98 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
|
|

6705 071202 1232472 viewsTurner Siding, CFCLA flat waggon AQPY type AQPY 2916, also carrying BHP road number 6705, a 55 tonne capacity waggon.
|
|

170730 0470472 viewsBoodarie, a loaded Roy Hill train approaches the Great Northern Highway grade crossing behind General Electric built ES44ACi units RHA 1013 serial 62585 and sister unit RHA 1014, the third and mid-train unit can be made out at the end of the rack as it curves. 30th July 2017. GeoData.
|
|

22658472 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M in the background and the two types of bogie which rode under the Mt Newman Mining ALCo units, in front is the ALCo Hi-Ad truck and behind is the MLW Dofasco truck. 20th July 1991.
Jim Bisdee photo.
|
|

080621 2800472 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
|
|

200914 7809472 viewsPilbara Railways Historical Society museum, Australian built by Comeng NSW an MLW ALCo M636 unit formerly owned by BHP 5502 serial C6096-7 built in July 1976, retired in 1994, donated to Society in November 1995. 14th September 2020.
|
|

218-34471 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine units General Electric Dash 9-44CW models 7089 serial 47768 on the right coupled to 7090 serial 47769 shows the radiator section and bogies of both units.
|
|

220-35471 viewsGoldsworthy Junction, empty train with the trailing loco a Goninan GE rebuild CM40-8ML model 5664 'Kaohsiung' serial 8412-09 / 94-155 was originally rebuilt without a driving cab for use as a LocoTrol II controlling remote, then one was retrofitted following improvements in the size of the required LocoTrol equipment and for operational purposes. Seen here as the trailing remote during a period of trials on Yandi trains where the consist was two leads units, 112 waggons, one loco, 112 waggons and the final loco.
|
|

150523 8219471 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0024, total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
|
|

236-13471 viewsNelson Point, Car Dumper Two delivery roads, BHP Dash 8 class locomotive 5636 'Munda', a Goninan 1991 rebuild to GE CM40-8M model, serial 8151-11 / 91-122 with a sister unit await to dump their train of Comeng style waggons, next to them is a string of Golynx style waggons and on the left sits an AC6000 6073 with a Dash 8 awaiting access to Car Dumper Three. The Ore Car Repair Shop is on the right.
|
|

239-12471 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
56 |  |
 |
 |
 |
 |
 |
 |
|