Most viewed - Pilbara negative and digital Albums - Iron Ore |

203-24264 viewsBing Siding, min-train unit on an empty Yandi working BHP General Electric built AC6000 6077 'Nimingarra' serial 51069 with the second style of PVC type windscreen protectors fitted.
|
|

151111 9524264 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs over the 54.04 km culvert on the West Mainline bound for Cape Lambert viewed from Table Hill.
|
|

151111 9538264 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
|
|

236-08264 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144, drivers side cab view.
|
|

040407 073250264 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 production and switch tamper serial 153172, runs east along the Goldsworthy line. 7th April 2004.
|
|

040809 164208264 viewsNelson Point yard, ballast regulator BR 31 a Plasser Australia model SSP 110SW unit serial 401. 9th August 2004.
|
|

170728 09855264 viewsWestern Creek - Emu area, Rio Tinto's General Electric built ES44DCi class leader 8100 serial 57996 leads two sister units, in 8176 and 8143 both in the later Rio Tinto stripe livery, with a loaded train running down from Emu Siding on the line to Dampier. The disabled Mesa A train is still on the bridge, the line to the left of the loaded is the Robe River Western Creek - Emu interconnecting line. 28th July 2017. GeoData.
|
|

060723 7764264 viewsRio Tinto compressor waggon set CB 03, receiver waggon with two air tanks or receivers. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
|
|

19797264 viewsBassendean, Goninan workshops, former BHP Iron Ore Goninan GE rebuild C36-7M unit 5509, seen here stripped down to being an engine test bed, view from the no. 1 end. Sept 2003.
Jim Bisdee photo.
|
|

170915 0714264 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1007 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
|
|

240-16264 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

241-08264 viewsNelson Point, Goninan GE rebuild C36-7M unit 5506 serial 4839-01 / 87-071 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. 5506 was rebuilt from NSW AE Goodwin built C636 ALCo number 5455 serial G6012-04 and was delivered in Mt Newman orange livery and originally named 'Mt Whaleback', after repainting into BHP blue was named 'Ethel Creek', then finally 'Mt Goldsworthy'. June 2002.
|
|

180615 1607264 viewsWalla Siding, BHP ballast waggon 0207 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.
|
|

080621 2794264 viewsWalla back track, BHP track machine TM04 a Plasser Australia unit model 09-3X serial M489. 21st June 2008.
|
|

200914 7764264 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

250-22264 viewsCape Lambert South Yard and Robe River's 9426 a Comeng WA rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Seen here in the South Yard dragging a loaded rake down to the car dumper as yard expansion works are underway to the left. 22nd October 2000.
|
|

210510 1135264 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTB 018 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
|
|

203-21263 viewsBing Siding, with the empty clear, BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 leading class leader 6070 'Port Hedland' serial 51062 as they power their train out of the passing track at Bing South.
|
|

219-27263 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train into the siding at Goldsworthy as the second driver watches the roll by under the shade of the shelter.
|
|

220-04263 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west from the eastern end of the siding.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
57 |  |
 |
 |
 |
 |
 |
 |
|