Most viewed - Pilbara negative and digital Albums - Iron Ore |

150523 8244320 viewsNelson Point Yard, loaded ore waggon 6531, a Golynx style waggon built by Goninan in 2007 with asset number of 2038898 out of 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
|
|

232-35320 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

239-01320 viewsView inside the diesel power station located at Yandi One of a freshly overhauled Caterpillar 3516 engine and Kato alternator. Genset no. 1. Shows the air operated skate system to manoeuvre the unit into position. GeoData.
|
|

239-16320 viewsView of Yandi One OHP looking from the secondary crusher west back to the primary crusher system with CV3 and the reclaim tunnel and the pedestal mount for CV2 evident. The mine, trucks and waste dump can be seen in the background. GeoData.
|
|

041225 064817320 viewsNelson Point, CFCLA ballast waggon CHRY type CHRY 746, side view from the ore car repair shop roads.
|
|

060414 3448320 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon, end view.
|
|

100717 0659320 viewsFlash Butt yard, new rail stock carrier waggon 6028, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

170728 09855320 viewsWestern Creek - Emu area, Rio Tinto's General Electric built ES44DCi class leader 8100 serial 57996 leads two sister units, in 8176 and 8143 both in the later Rio Tinto stripe livery, with a loaded train running down from Emu Siding on the line to Dampier. The disabled Mesa A train is still on the bridge, the line to the left of the loaded is the Robe River Western Creek - Emu interconnecting line. 28th July 2017. GeoData.
|
|

22657320 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

23907320 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 ALCo 251 prime mover, being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
|
|

24902320 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.
|
|

242-26320 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is a Goldsworthy Mining B class unit #2 built by English Electric serial number A-105, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit. May 2002.
|
|

150619 9149320 viewsMooka, side section 4 of 5, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white, Mermec fitted a Tecnogamma system as part of a refurbishment.
|
|

080120 1469320 viewsThomas Yard, new FMG ore waggon pair 1263 slave and 2264 control waggons, 22.6 tonnes tare with rotary coupler, and the master at 22.9 tonnes. View from the handbrake end coupled to a GE Dash 9-44CW unit 011. 20th January 2008.
|
|

200914 7794320 viewsPilbara Railways Historical Society, a pair of NSWGR 2AE type bogies. 14th September 2020.
|
|

247-20320 viewsCape Lambert yard view with Robe River Comeng WA ALCo Schenectady NY model rebuild C636R unit 9426 dragging a loaded 101 waggon rake from the South Yard across Bells Crossing while a brace of four Goninan CM40-8M GE rebuilds wait at the fuel point for a departure with an empty train. Approximate location of photo is here. 22nd May 2002.
|
|

250-02320 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|

218-21319 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km with a loaded train on approach.
|
|

220-30319 viewsGoldsworthy Junction, the afternoon empty departure for Yandi mine behind the standard double Dash 8 power consist of 5649 'Pohang' a Goninan GE rebuild CM40-8M model serial 8412-07 / 93-140 and a sister unit, the line merging from the right is the former Goldsworthy line from Yarrie and Nimingarra mines. This area is now fully duplicated with LED signals and the Dash 8 units have been scrapped.
|
|

229-04319 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
|
|
6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
57 |  |
 |
 |
 |
 |
 |
 |
|