Most viewed - Pilbara negative and digital Albums - Iron Ore |

070622 0223259 viewsMooka in the back track siding, BHP Iron Ore's track recording vehicle, EM80 which is a Plasser & Theurer EM-80 model and still wearing the old BHP blue and white livery, this unit was delivered in Mt Newman Mining orange and white.
|
|

080304 2179259 viewsThomas Yard, down the rail welding end, side view of control waggon 2324, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
|
|

200914 7793259 viewsPilbara Railways Historical Society, bearing journal box of the former NSWGR four wheel underframe. 14th September 2020.
|
|

220-12258 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.
|
|

151111 9563258 viewsAn empty train struggles upgrade at the 84 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
|
|

232-15258 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.
|
|

239-01258 viewsView inside the diesel power station located at Yandi One of a freshly overhauled Caterpillar 3516 engine and Kato alternator. Genset no. 1. Shows the air operated skate system to manoeuvre the unit into position. GeoData.
|
|

239-09258 viewsOverview of Yandi One mine from the end of the radial stacker boom looking south. Buildings visible from the left, diesel fuel farm, sample hut, workshops beyond the power station and the offices in the background. GeoData.
|
|

040806 103206258 viewsFlash Butt yard, heavily modified Magor USA built ex-Oroville Dam ore waggon 661, seen here modified for LocoTrol service and testing.
|
|

060414 3448258 viewsNelson Point yard, originally a Magor USA built ballast waggon for the Oroville Dam construction, 507 seen here modified as a weighbridge test waggon, end view.
|
|

060429 3749258 viewsFlash Butt yard, Pony re-laying waggon 6703 is a heavily cut down and modified Magor USA ore waggon done by Mt Newman Mining workshops, converted to a 50 tonne flat waggon.
|
|

040407 073324258 viewsGoldsworthy Junction, Barclay Mowlem's R.E.L.A.M lease ballast plough, Knox Kershaw KBR 850 model travels east along the Goldsworthy line past the dual headed GJ 9 signal. 7th April 2004
|
|

050407 0381258 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050801 4738258 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper. 1st August 2005.
|
|

060724 7864258 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 24th July 2006.
|
|

22657258 viewsBassendean, during an Open Day at the Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. 20th July 1991.
Jim Bisdee photo.
|
|

200412 5554cr258 viewsBoodarie, part of an FMG loaded train CNR (China Northern) QRRS (Qiqihar Rolling Stock Works) built waggon pair 7419 slave waggon and 8420 control waggon, crop of the waggon details of AXLE LOAD 45 t, CAPACITY 156.1 t, VOLUME 69m³. 12th April 2020.
|
|

200914 7814258 viewsPilbara Railways Historical Society, cab side views of former Goldsworthy Mining locomotive 1 an English Electric ST95B model built in Qld and former Mt Newman Mining / BHP Iron Ore locomotive 5502 an ALCo M636 model built by Comeng NSW. 14th September 2020.
|
|

246-15258 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

250-02258 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
|
|
4019 files on 201 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
59 |  |
 |
 |
 |
 |
 |
 |
|