Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
239-37.jpg
239-37376 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
040805_095638.jpg
040805 095638376 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
170729_0303.jpg
170729 0303376 viewsMaitland Siding on the former Robe River line an empty Mesa A bound train behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9117 serial 63830 and sister unit 9115 pull out of the passing siding and onto the mainline. 29th July 2017. GeoData.
170730_0513.jpg
170730 0513376 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.
22654.jpg
22654376 viewsBassendean, Goninan workshops, brand new GE CM40-8M rebuild unit for BHP Iron Ore 5634 'Boodarie' serial 8151-07 / 91-120 looks to be in the final stages of construction as it sits out side during an Open Day on 20th July 1991 with WAGR Fs 460 4-8-0 steam locomotive and Xa Class No 1405 'Warienga'. 20th July 1991.
Jim Bisdee photo.
23694.jpg
23694376 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
170915_0721.jpg
170915 0721376 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1004 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
171018_0952.jpg
171018 0952376 viewsTad Yard and Roy Hill's General Eclectic ES44ACi model units RHA 1017 serial number 63828 and RHA 1015 serial number 63826 idle away in between duties. These ES44ACi units were built in September 2015 at Erie Pennsylvania, USA. 18th October 2017.
240-36.jpg
240-36376 viewsSeven Mile, a pair of re-walled Nippon Sharyo built waggons, control waggon 697 on the right with slave waggon 5870 on a loaded train bound of the Parker Point tippler. 31st August 2002.
180616_1772.jpg
180616 1772376 viewsAt the 81 km on the Tom Price West mainline, Rio Tinto loco 7056 with serial 55881 a GE Erie built GE model Dash 9-44CW from the 8th order in HI Pilbara Iron livery with heavy rust on the visor and the AutoHaul™ light has actually dislodged from the cab roof, this unit was from the eighth order of Dash 9-44CW units built at GE Erie in April 2005. 16th June 2018.
221-13.jpg
221-13375 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.
224-02.jpg
224-02375 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.
224-11.jpg
224-11375 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, shows new nameplate, steerable bogie and taper in cab side, second unit behind sister loco 6076. GeoData.
225-29.jpg
225-29375 viewsBing siding backtrack, Tomlinson WA built GML ore waggon 8104 loaded with ballast, side view. GeoData.
226-10.jpg
226-10375 viewsRedmont, at the 202 km the mid-train trailing remote Goninan rebuild CM40-8M GE unit 5639 'Corunna Downs' serial 8281-03/92-128. GeoData.
228-17.jpg
228-17375 viewsYandi Two, the only real land mark on the Yandi Two branchline is this bridge over an un-named creek at the YT307 km with the afternoon empty train on approach. Geodata -22.706976, 119.097651 .
230-14.jpg
230-14375 viewsYandi Two load-out tunnel exit side portal, Goninan rebuild GE CM40-8M model 5654 'Kashima' serial 8412-11/93-145 creeps out of the tunnel as its train is loaded at 1.2 km/h. The livery is the marigold version of the BHP Australia logo. Geodata -22.718338, 119.039909 .
151111_9538.jpg
151111 9538375 viewsAn empty train led by General Electric ES44DCi units 8162 serial 60226 and 8167 serial 60231 both in the Rio Tinto tiger strip livery leading Dash 9-44CW 7093 serial 47772, the last of the original build of Dash 9 units crossing Lake Poongkaliyarra.
150523_8245.jpg
150523 8245375 viewsNelson Point Yard, loaded ore waggon 9040, a Golynx style waggon built by Goninan in 2005 with asset number of 203485 out of 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
170728_09974.jpg
170728 09974375 viewsBenson Falls, 91 km curve, an empty train blasts up the steep grade behind a triple all General Electric built Dash 9-44CW unit power of 9409 serial 54159 and 9408 both in Pilbara Rail with Robe reporting marks, and 7060 in Pilbara Iron with HI reporting marks. 28th July 2017. GeoData.
6096 files on 305 page(s) 59

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional