Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
250-10.jpg
250-10130 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
250-13.jpg
250-13130 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
219-24.jpg
219-24129 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train into the siding at Goldsworthy as the second driver sets the road.
219-25.jpg
219-25129 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train into the siding at Goldsworthy as the second driver sets the road.
223-35.jpg
223-35129 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
229-04.jpg
229-04129 viewsYandi Two at the 311.5 km with an empty BHP train heading for the loadout behind a pair of Goninan rebuild CM40-8M GE units with second unit 5642 'Wallareenya' serial 8281-07 / 92-131 trailing sister unit 5650. GeoData.
151111_9530.jpg
151111 9530129 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
151111_9561.jpg
151111 9561129 viewsGreen Pool, a loaded train holds the East Mainline behind triple General Electric ES44DCi units 8169, 8128 and 8163, serials of 60462, 59120 and 60227, the east line was booked out to track work between Green Pool and Harding.
151111_9563.jpg
151111 9563129 viewsAn empty train struggles upgrade at the 84 km post on the Tom Price line behind double General Electric Dash 9-44CW units 9403 serial 53457 wearing ROBE Pilbara Rail livery and 7087 serial 47766 wearing the original Hamersley Iron livery.
236-09.jpg
236-09129 viewsNelson Point, Loco Overhaul Shop, BHP Dash 8 class locomotive 5653 'Chiba', a Goninan 1994 rebuild to GE CM40-8M model, serial 8412-10 / 93-144, drivers side cab view.
236-14.jpg
236-14129 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 sits out the front with new windscreen protectors or 'blinkers' fitted.
239-05.jpg
239-05129 viewsView from the radial stacker boom at Yandi One looking west, the rail loading balloon loop and dust extractor are visible at the bottom of the image and the mine waste dump is in the background. GeoData.
170729_0191.jpg
170729 0191129 views109 km on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 drag upgrade. 29th July 2017. GeoData.
060723_7846.jpg
060723 7846129 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
6991_001_Welshpool_19880904.jpg
6991 001 Welshpool 19880904129 viewsWelshpool, Goninan workshops, brand new Mt Newman Mining's GE model CM39-8 loco 5630 'Zeus' serial 5831-09 / 88-079 is lashed down on a road transport float ready for haulage to Port Hedland in this 4th September 1988 image.
Jim Bisdee photo.
23761.jpg
23761129 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M and the ARHS former WAGR B class shunt engine. January 1993.
Jim Bisdee photo.
23879.jpg
23879129 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. July 1993.
Jim Bisdee photo.
23906.jpg
23906129 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5474 serial G6047-6 being stripped prior to rebuilding into CM40-8M 5655 in December 1993. July 1993.
Jim Bisdee photo.
170915_0719.jpg
170915 0719129 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1012 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
170915_0722.jpg
170915 0722129 viewsAt the 18.2 km as part of the empty Roy Hill fuel train, TA type diesel fuel tank waggon TA 1003 built by CSR Yangtze Rolling Stock Co China with a capacity of 96000 litres. 15th September 2017. View map here.
3723 files on 187 page(s) 60

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional