Most viewed - Pilbara negative and digital Albums - Iron Ore |

0004 Comeng NSW 150314 7752462 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71.
|
|

170729 0289462 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.
|
|

170730 0490462 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.
|
|

23760462 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
|
|

242-13462 viewsNelson Point, Loco Overhaul Shop, General Electric built AC6000 locomotive 6076 'Mt Goldsworthy' serial 51068 with engine and alternator removed. May 2002.
|
|

242-27462 viewsPort Hedland, Don Rhodes Mining Museum, preserved locomotives from the early days of the Port Hedland iron ore miners of Goldsworthy Mining and Mt Newman Mining. From left is a Goldsworthy Mining B class unit #2 built by English Electric serial number A-105, Mt Newman Mining 5451 which was built by EMD as an F7A model and started life with Western Pacific in the USA and Mt Newman Mining 5497, a Comeng NSW built M636 ALCo unit. May 2002.
|
|

01395-02396 080116 1373462 viewsChapman Siding, view showing the bogies and bar coupling, train pipe, control pipe and electrical jumper of FMG married pair of slave 1395 on the left and master 2396 on the right. The BHP Newman line in the back ground. 16th January 2008.
|
|

200914 7762462 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

200914 7812462 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

200914 7813462 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

219-25461 viewsGoldsworthy Siding, C36-7M unit 5507 'Nimingarra' serial 4839-03 / 87-072, an original Mt Newman Mining ALCo C636 5461 to GE C36-7M rebuild carried out by Goninan, leads an empty train into the siding at Goldsworthy as the second driver sets the road.
|
|

221-13461 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02 is backing out onto the mainline with an empty train that will continue onto Yarrie for loading.
|
|

225-08461 viewsBing siding, General Electric AC6000 model unit 6073 serial 51065 built at GE Erie is the mid-train remote for the afternoon empty Yandi mine train as it heads south. This was before the units were named. GeoData.
|
|

231-04461 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 'Yawata' serial 8412-07 / 93-141, note the difference in the liveries, 50 is in the teal and marigold logo and logo on the hood while 52 has the silver logo on the front only and no logo on the hood. GeoData.
|
|

232-25461 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.
|
|

239-11461 viewsOverview of Yandi One looking towards the stockpile along CV11 towards CV20 and the radial stacker and CV21 the boom conveyor and full stockpile indicating the impending arrival of a train. The steel laydown is visible on the right. GeoData.
|
|

Pony Harsco 060429 3765461 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

180615 1575461 viewsWalla Siding, BHP ballast waggon 0226 built from JFE410RW steel by CNR QRRS China. 15th June 2018. Roland Depth image.
|
|

246-20461 viewsCape Lambert, a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 riding on Dofasco bogies and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
|
|

246-25461 viewsCape Lambert, Robe River locomotive 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
63 |  |
 |
 |
 |
 |
 |
 |
|