Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
223-35.jpg
223-35460 viewsPossum Siding 227 km, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 on a loaded train ex Marandoo holds the mainline awaiting clearance north. 21st October 2000.
224-14.jpg
224-14460 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, radiator, steerable bogie and taper in cab side. GeoData.
224-17.jpg
224-17460 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.
151111_9536.jpg
151111 9536460 viewsView north from Table Hill. The white dots are a reflection from the high tension powerline poles.
040806_092732.jpg
0522 Mt Newman Mining Workshops 040806 092732460 viewsGoldsworthy Junction, weighbridge test waggon 522, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon. The others in the fleet are 40, 60 and 100 tons.
040806_101910.jpg
0206 Mt Newman Mining Workshops 040806 101910460 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, 3/4 view from handbrake end.
050525_2990.jpg
6213 Comeng WA 050525 2990460 viewsMooka Siding, rail recovery and transport train flat waggon #22, 6213, built by Comeng WA in February 1977 under order number 07-M-282 RY.
060429_3722.jpg
060429 3722460 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
040809_164208.jpg
040809 164208460 viewsNelson Point yard, ballast regulator BR 31 a Plasser Australia model SSP 110SW unit serial 401. 9th August 2004.
050407_0379.jpg
050407 0379460 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
060501_3926.jpg
060501 3926460 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, view of Matisa drive bogie plate. 1st May 2006.
170729_0415.jpg
170729 0415460 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.
241-10.jpg
241-10460 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers cab side view. June 2002.
200914_7794.jpg
200914 7794460 viewsPilbara Railways Historical Society, a pair of NSWGR 2AE type bogies. 14th September 2020.
246-18.jpg
246-18460 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
252-03.jpg
252-03460 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
219-33.jpg
219-33459 viewsGoldsworthy Siding, a loaded train powers along the mainline behind BHP C36-7M unit 5513 'Kalgan' serial 4839-02 / 88-078, an original Mt Newman Mining ALCo C636 5453 to GE C36-7M rebuild carried out by Goninan.
221-19.jpg
221-19459 viewsHardie Siding, Tomlinson Steel cars make up the bulk of the fleet and the rear portions of the Goldsworthy Line trains.
222-18.jpg
222-18459 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train to a stand with 7071 for a crew change.
224-06.jpg
224-06459 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.
6220 files on 311 page(s) 64

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional