Most viewed - Pilbara negative and digital Albums - Iron Ore |

040815 164619424 viewsNelson Point, CFCLA ballast waggon CHQY type 730 just being delivered to BHP Iron Ore as part of the Rail PACE project, 3/4 view from handbrake end.
|
|

100717 0659424 viewsFlash Butt yard, new rail stock carrier waggon 6028, built by Gemco Rail in late 2009-10 with Barber bogies.
|
|

5949 001424 viewsBuilders plate on Goninan rebuilt GE C36-7M unit 5506 'Mt Whaleback' serial 4839-01 / 87-071 rebuilt using Mt Newman Mining AE Goodwin ALCo C636 5455 serial G6012-4. January 1987.
Jim Bisdee photo.
|
|

23142424 viewsBassendean, Goninan workshops, ALCo 251 diesel engines, these are believed to have been exported to Mexico. March 1993.
Jim Bisdee photo.
|
|

240-08424 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.
|
|

240-16424 viewsWickham, left hand side number one end view of former Robe River and NSWGR MLW built ALCo RSC3 serial 77737 of October 1951, was originally 40 class 4006. Shows modified bogie to convert the A1A to a BO bogie type. 31st August 2002.
|
|

080621 2801424 viewsWalla back track, BHP track machine TM04 a Plasser Australia unit model 09-3X serial M489. 21st June 2008.
|
|

080116 1376424 viewsChapman Siding, FMG slave waggon 1187, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China during 2007, view of the number decal builders plate and bracket for RFID tag with the last painted date placard. 16th January 2008.
|
|

200914 7813424 viewsPilbara Railways Historical Society, Goldsworthy Mining Ltd B class unit 1, an English Electric built ST95B model, originally built in 1965 serial A-104, due to accident damage rebuilt on new frame with serial A-232 in 1970. These units of Bo-Bo design with a 6CSRKT 640 kW prime mover and built at the Rocklea Qld plant. Donated to Society in 1995. 14th September 2020.
|
|

203-23423 viewsBing Siding, empty train waggons over the Bing South switch, two Golynx waggons can be identified by their smooth sides.
|
|

220-01423 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking east from the 135 km post.
|
|

221-32423 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
|
|

222-18423 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train to a stand with 7071 for a crew change.
|
|

224-23423 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
|
|

232-34423 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, Goninan rebuild CM40-8M GE unit 5658 'Kakogawa' serial 8412-03 / 94-149 with the round tanks it is a rebuild from an AE Goodwin built M636 ALCo 5480. 18th of February 1997. GeoData.
|
|

050801 4735423 viewsFlash Butt yard, Barclay Mowlem TM 21 a Plasser Australia 09-16 model tamper bar coupled to the clip installing machine. 1st August 2005.
|
|

060501 3926423 viewsAbydos Siding backtrack, Speno rail grinder RG 1, a RR24 model grinder with 24 grinding wheels, serial M20, generating set and second driving cab module, view of Matisa drive bogie plate. 1st May 2006.
|
|

060723 7825423 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
|
|

23694423 viewsBassendean, Goninan workshops, Mt Newman Mining's AE Goodwin built ALCo model M636 unit 5473 serial G6047-5 undergoing rebuilding into a GE CM40-8M unit, 5473 would emerge rebuilt as 5649 in July 1993. December 1992.
Jim Bisdee photo.
|
|

242-31423 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view looking into driving cab. May 2002.
|
|
| 6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
66 |  |
 |
 |
 |
 |
 |
 |
|