Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
050409_0393.jpg
050409 0393455 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
060811_8014.jpg
060811 8014455 viewsGarden Siding, Speno rail grinder RG 1 an RR24 model grinder serial M20 coupled with RG 2 in the passing track. 11th August 2006.
170728_10030.jpg
170728 10030455 viewsHarding Siding, arriving around the large curve at the 46 km on the Robe line is General Electric built ES44DCi unit 8124 serial 59116 leading Dash 9-44CW unit 7094 and sister ES44DCi unit 8186 with a loaded train from Yandicoogina mine. 28th July 2017. GeoData.
080116_1369.jpg
01395 080116 1369455 viewsChapman Siding, view from the hand brake end with F type Interlock coupling and hand brake wheel arrangement, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 16th January 2008.
080116_1384.jpg
NYAB 080116 1384455 viewsChapman Siding, view of the New York Air Brake module, on the left is the EP60VV vent valve, then the CCD waggon control device and then the manual release.
200914_7793.jpg
200914 7793455 viewsPilbara Railways Historical Society, bearing journal box of the former NSWGR four wheel underframe. 14th September 2020.
250-13.jpg
250-13455 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 on the loop as a loaded train with 210 waggons passes behind a sister pairing of 7072 serial 47751 and 7074 serial 47753. 1550 hrs 21st October 2000.
250-14.jpg
250-14455 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 1550 hrs 21st October 2000.
252-05.jpg
252-05455 viewsCockatoo Siding 273 km on the Hamersley Iron line to Yandi, General Electric built 9-44CW unit 7088 with serial number 47767 from the original 1994 build idles away on the eastern end of the ballast train as it is loaded and slowly progresses into the back track siding Ballast plough BP 02 is behind the locomotive. Location is roughly here. 24th November 2001.
210510_1132.jpg
210510 1132455 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTW type intermediate rail waggon RTW 021 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
110620_2020r.jpg
7000 Goninan 110620 2020455 viewsWalla Siding, empty BHP ore waggon 7000, a Goninan WA build of the Golynx design from April 2008. June 20, 2011.
220-04.jpg
220-04454 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west from the eastern end of the siding.
221-10.jpg
221-10454 viewsHardie Siding, with the days of C36-7M operations numbered, Goninan rebuild 5513 serial 88-078 / 4839-02 from ALCo C636 5453 heads away from Hardie past the location equipment and the train crew shelter with a loaded train bound for Finucane Island.
222-03.jpg
222-03454 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train approaches behind two General Electric AC6000 units built by GE at their Erie plant, BHP 6071 serial 51063 leads sister unit 6074, 6071 has not been named as yet. This road was also the original road into Lynas Find Gold Project, back in the day. GeoData.
222-19.jpg
222-19454 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7066 serial 47745 a General Electric Dash 9-44CW built by GE at Erie.
225-12.jpg
225-12454 viewsBing siding, looking south, signal post BGN 3 arrival signal for south bound movements, empty train heading south, 5669 'Beilun' serial 8412-02 / 95-160 was the final Dash 8 rebuilt for BHP Iron Ore by Goninan as a CM40-8MEFI GE rebuilt from an ALCo, light engine on approach. GeoData.
040815_164711.jpg
CHQY 740 040815 164711454 viewsNelson Point, CFCLA ballast waggon CHQY type 740 just being delivered to BHP Iron Ore as part of the Rail PACE project, side view.
050412_0775.jpg
0502 Magor USA 050412 0775454 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 502.
23732.jpg
23732454 viewsBassendean, Goninan workshops, Mt Newman Mining AE Goodwin built ALCo M636 unit, 5481 serial G6061-2 awaiting rebuilding into CM40-8M 5650 in July 1993. January 1993.
Jim Bisdee photo.
080621_2806.jpg
080621 2806454 viewsWalla back track, BHP track machine BR 34 a Plasser Australia unit model 305 serial M490. 21st June 2008.
6220 files on 311 page(s) 69

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional