Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
220-12.jpg
220-12418 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.
223-32.jpg
223-32418 viewsPossum Siding, a loaded train behind a pair of Hamersley Iron General Electric built Dash 9-44CW units 7072 serial 47751 and 7074 serial 47753 with the crew change completed, the empty is rolling past on the passing track. 21st October 2000.
228-01.jpg
228-01418 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
229-12.jpg
229-12418 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
040616_162248.jpg
040616 162248418 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
040407_073250.jpg
040407 073250418 viewsGoldsworthy Junction, Barclay Mowlem track tamper a Fairmont Jackson model 6700 production and switch tamper serial 153172, runs east along the Goldsworthy line. 7th April 2004.
040809_164208.jpg
040809 164208418 viewsNelson Point yard, ballast regulator BR 31 a Plasser Australia model SSP 110SW unit serial 401. 9th August 2004.
050409_0393.jpg
050409 0393418 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480. 9th April 2005.
050409_0405.jpg
050409 0405418 viewsShell Swagman Roadhouse, Lampson eighty wheel float ready to deliver BHP's new mainline tamper a Plasser Australia 09-3X model with serial M480 side view of cab rear. 9th April 2005.
050412_0818.jpg
050412 0818418 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
100717_0682.jpg
100717 0682418 viewsFlash Butt yard, new rail stock carrier waggon 6031, built by Gemco Rail in late 2009-10 with Barber bogies.
060723_7824.jpg
060723 7824418 viewsOriginal Hamersley Iron compressor waggon sets IC-1 and IC-3 which were made from cutting down condemned ore waggons and then fitting Atlas Copco XAS 97 air compressors, receiver tanks and fuel tanks. The compressors have been fitted to a swing cradle to limit the in-train forces during the unloading process. 7 Mile 23rd July 2006.
23761.jpg
23761418 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M and the ARHS former WAGR B class shunt engine. January 1993.
Jim Bisdee photo.
242-36.jpg
242-36418 viewsPort Hedland, Don Rhodes Mining Museum, preserved Mt Newman Mining Comeng NSW built ALCo M636 unit 5497 serial C6096-2, view looking at back of cab wall. May 2002.
241-16.jpg
241-16418 viewsNelson Point, Goninan GE rebuild C36-7M unit 5510 serial 4839-07 / 87-075 is in the process of being removed from site bound for Asset Kinetics in Maddington, Perth. Drivers side cab front view with plough removed. June 2002.
200914_7793.jpg
200914 7793418 viewsPilbara Railways Historical Society, bearing journal box of the former NSWGR four wheel underframe. 14th September 2020.
247-05.jpg
247-05418 viewsCape Lambert fuel point, Robe River Dash 8 power 9425 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 6266-8 / 89-85 from August 1989 riding on Hi-Ad bogies and was originally an AE Goodwin built M636 ALCo serial C-6041-4 and built new for Mt Newman Mining (later BHP Iron Ore) in April 1970 and numbered 5468, sold to Robe and delivered by road 17th August 1982. Everything below the frame is ALCo while above is GE and Pilbara Cab. Approximate location of the locos is here. 22nd May 2002.
218-22.jpg
218-22417 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km with a loaded train on approach.
221-14.jpg
221-14417 viewsHardie Siding, BHP Iron Ore Goninan rebuild unit CM40-8MEFI 5669 the last Dash 8 rebuilt for BHP and one of four fitted with an EFI prime mover, serial 95-160/8412-02, with the switch restored for the mainline the 2nd Person climbs aboard to continue on to Yarrie Mine.
222-20.jpg
222-20417 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie.
6096 files on 305 page(s) 70

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional