Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
228-00.jpg
228-00453 viewsNoranda, Perth, a Sigma sedan after running up the arse of my HJ75 Landcruiser. Only damage to the ute was a numberplate!
229-12.jpg
229-12453 viewsYandi Two at the 311.5 km, empty BHP train mid-train Goninan rebuild CM40-8M GE units 5657 'Fukuyama' serial 8412-02 / 94-148 trailing remote unit, cab side. GeoData.
170728_09678.jpg
170728 09678453 viewsRio Tinto compressor waggon set CB 12, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors and the receiver waggon with two air tanks or receivers. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 28th July 2017.
24902.jpg
24902453 viewsBassendean, Goninan workshops, Mt Newman Mining's Comeng NSW built ALCo M636 5504 serial C6104-2 sits out the back in a partially stripped state with fellow unit 5503. Both of these units was subsequently scrapped. July 1995.
Jim Bisdee photo.
240-36.jpg
240-36453 viewsSeven Mile, a pair of re-walled Nippon Sharyo built waggons, control waggon 697 on the right with slave waggon 5870 on a loaded train bound of the Parker Point tippler. 31st August 2002.
080116_1384.jpg
NYAB 080116 1384453 viewsChapman Siding, view of the New York Air Brake module, on the left is the EP60VV vent valve, then the CCD waggon control device and then the manual release.
080304_2181.jpg
02342 080304 2181453 viewsThomas Yard, down the rail welding end, side view of control waggon 2342, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
250-19.jpg
250-19453 viewsWater hole somewhere in the Pilbara around the Dampier - Tom Price railway area. 21st October 2000.
267-24.jpg
267-24453 viewsGoldsworthy Junction, CM40-8M GE rebuild unit 5653 'Chiba' serial number 8412-10 / 93-144 trails sister unit 5634 as 5634 turns on the power as it passes Goldsworthy Junction relay room and continues along the Newman Mainline with the Sundowner Special. Friday 12th of April 2002.
218-33.jpg
218-33452 viewsYandicoogina or HIY as Hamersley Iron identify it, located 445 km from Parker Point yard in Dampier. Bank engine unit General Electric Dash 9-44CW model 7090 serial 47769 in the delivered 'Pepsi Can' livery.
222-03.jpg
222-03452 viewsAt the 105.7 km grade crossing near Gillam Siding, a loaded Yandi train approaches behind two General Electric AC6000 units built by GE at their Erie plant, BHP 6071 serial 51063 leads sister unit 6074, 6071 has not been named as yet. This road was also the original road into Lynas Find Gold Project, back in the day. GeoData.
224-23.jpg
224-23452 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
229-16.jpg
229-16452 viewsYandi Two loadout, looking at the exit portal of the tunnel as Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 drags a loading through at 1.2 km/h, the massive pile of ore is gravity fed into the waggons via two sets of hydraulic chutes, the red and amber lights control access through the tunnel and the steel pipe is for dust extraction. GeoData.
230-06.jpg
230-06452 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
150523_8207.jpg
150523 8207452 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0031 with safety slogan 'Safety - It's your life', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150523_8217.jpg
150523 8217452 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0044 with safety slogan 'Don't drive distracted', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
150523_8245.jpg
150523 8245452 viewsNelson Point Yard, loaded ore waggon 9040, a Golynx style waggon built by Goninan in 2005 with asset number of 203485 out of 5Cr12Ti stainless steel which does away with the need to paint the waggon interiors to prevent wear.
231-13.jpg
231-13452 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
239-27.jpg
239-27452 viewsYandi Two, conveyor belt CV202 failure of the primary crushing circuit conveyor. GeoData.
040616_162248.jpg
Sundowner EG Budd USA 040616 162248452 viewsNelson Point, the Sundowner coach, originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
6220 files on 311 page(s) 70

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional