Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
23733.jpg
23733412 viewsBassendean, Goninan workshops, a stripped back ALCo locomotive frame under re-construction which will become a GE CM40-8M. January 1993.
Jim Bisdee photo.
241-07.jpg
241-07412 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096-4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation, cab side view. June 2002.
218-25.jpg
218-25411 viewsDe Grey, Great Northern Highway grade crossing at the 57.15 km a loaded GML train with Gunderson USA (smooth) and Portec USA (ribbed) built waggon behind the C36-7M loco. The waggons are ex-Phelps Dodge Copper Mine.
228-24.jpg
228-24411 viewsYandi Two branch, trailing shot of the afternoon empty train mid-train remotes heading west near the YT307 km in the form of elephant style Goninan final rebuild GE CM40-8MEFI model unit 5669 'Beilun' serial 8412-02/95-160 and CM40-8M model 5638 'Mallina' serial 8281-02/92-127. Geodata -22.706976, 119.097651 .
151111_9519.jpg
151111 9519411 viewsA loaded train behind General Electric ES44DCi units 8113 serial 59105 in the original silver livery and 8145 serial 58726 in the tiger strip Rio livery and Dash 9-44CW 9433 serial 54766 in ROBE Pilbara Iron livery runs along on the West Mainline bound for Cape Lambert viewed from Table Hill.
150523_8224.jpg
150523 8224411 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0033 with safety slogan 'Don't drive tired', total capacity of 117 m3 for a nominal capacity of 113 m3 built in China by CNR - QRRS.
231-31.jpg
231-31411 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.
238-21.jpg
238-21411 viewsNelson Point loco overhaul shop, former Union Pacific loco 3523 an EMD SD40-2 model, serial 786170-25 and now numbered 3085 for BHP Billiton Iron One service had only been in operation for eleven days when this shot was taken on the 27th November 2004. Geodata .
040805_095721.jpg
040805 095721411 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.
050315_0240.jpg
050315 0240411 viewsRedbank Bridge, elevated view of empty 116 kL fuel tanks all built by Comeng in both NSW and WA, 0013 and others in the BHP blue and white livery.
050724_4308.jpg
050724 4308411 viewsBing Siding, empty fuel tank waggon 0015, a Comeng WA built 116 kilolitre tank waggon, one of a batch of six built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
060429_3722.jpg
060429 3722411 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
050421_1617.jpg
050421 1617411 viewsHesta Siding backtrack, Speno Australia's RR24 model 24 stone rail grinder serial M20 before they had id stickers fitted, this unit was later stickered as RG 1, rear view of the generator and driving module. 21st April 2005.
170729_0415.jpg
170729 0415411 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.
080124_1622.jpg
080124 1622411 viewsChapman Siding, view of the hand brake end with F type Interlock coupling, uncoupling lever and hand brake wheel arrangement, control waggon 2256, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
246-17.jpg
246-17411 viewsCape Lambert, yard view of the then new extension to the south for the West Angelas mine was coming on stream as a Robe River loaded Deepdale train arrives on the main behind the standard quad Dash 8 power with 202 waggons. 9414 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8206-11 / 91-124 from November 1991 and was originally an AE Goodwin built M636 ALCo built new for Robe in December 1971 and numbered 262.005, later numbered 1714. 22nd May 2002.
250-02.jpg
250-02411 viewsPelican Siding on the Hamersley Iron Tom Price line about the 208 km with an empty train behind the standard pairing of two General Electric built 9-44CW units 7068 serial 47747 and 7067 serial 47746 stand on the loop or passing track for a meet with a loaded train. 21st October 2000.
220-28.jpg
220-28410 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
222-37.jpg
222-37410 viewsLoaded Hamersley Iron Comeng NSW built ore waggon 562, one of a batch of 150 built in 1968.
151111_9561.jpg
151111 9561410 viewsGreen Pool, a loaded train holds the East Mainline behind triple General Electric ES44DCi units 8169, 8128 and 8163, serials of 60462, 59120 and 60227, the east line was booked out to track work between Green Pool and Harding.
6096 files on 305 page(s) 77

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional