Most viewed - Pilbara negative and digital Albums - Iron Ore |

236-18114 viewsNelson Point Loco Overhaul Shop, BHP Iron Ore's Goninan GE rebuilt CM40-8MEFI unit 5669 'Beilun' serial 8412-02 / 95-160 sits out the front awaiting attention.
|
|

238-01114 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer, call sign PEND (IMO: 8300389) built in 1984 at Hitachi Shipbuilding Osaka Japan as class LRS X 100A1 X LMC UMS, sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|

238-15114 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
|
|

040805 095643114 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
|
|

040806 091930114 viewsGoldsworthy Junction, 5666 runs the weighbridge test train with the four orange weighbridge test waggons and two ore waggons to provide braking.
|
|

050412 0735114 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.
|
|

051001 5627114 viewsFlash Butt yard, heavily stripped down riveted waggon 206, possible original ballast waggon, number 206 was originally a waggon in the 'Camp Train' and appears to have USA origin, view of handbrake end, pushed into earth bund.
|
|

051001 5639114 viewsFlash Butt yard, side view of ballast plough converted from Magor USA built Oroville ore waggon 538, still visible is the ODCX 82160 number from original service building the Oroville Dam.
|
|

060429 3725114 viewsFlash Butt yard, Pony waggon #1, modified from a Magor USA built Oroville ore waggon, with a Comeng built gantry carrier.
|
|

050407 0382114 viewsNelson Point yard hard stand area sees brand new having only been delivered, BHP track tamper support trailer for Tamper 3 which will arrive in a couple of days. Plasser Australia 09-3X model with serial M480. 7th April 2005.
|
|

050410 0513114 viewsNelson Point yard hard stand area sees brand new having only been delivered the day before, BHP track tamper to become Tamper 3, a Plasser Australia 09-3X model with serial M480. 10th April 2005.
|
|

050625 3656114 viewsMooka North, BHP's new Tamper 3 track machine a Plasser Australia 09-3X model serial M480 in out on the passing track. 25th June 2005.
|
|

060403 3273114 viewsTabba North, Barclay Mowlem high-rail Pettibone model 445-E Speed Swing, with the moniker Skinny's Bone. 3rd April 2006.
|
|

060501 3912114 viewsAbydos Siding backtrack, Speno rail grinder RG 2, first grinding module. 1st May 2006.
|
|

060501 3930114 viewsAbydos Siding backtrack, Speno rail grinder RG 2 coupled to RG 1. 1st May 2006.
|
|

060710 6233114 viewsAt the Broome Rd grade crossing Port Hedland, track machine BR 33 a Plasser Australia ballast regulator model SSP 302 serial M486. 10th July 2006.
|
|

150523 8219114 viewsNelson Point, empty 116 kL CNR-QRRS of China built tank waggon 0024, one of a batch of ten built in 2014.
|
|

060723 7762114 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 23rd July 2006.
|
|

241-37114 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.
|
|

246-37114 viewsCape Lambert, a Robe River loaded Deepdale train rolls along the mainline behind the standard quad Dash 8 power with 202 waggons which are a mix of builds from Nippon Sharyo Japan and Tomlinson Steel and Centurion Industries both WA companies. The ore is a ROM product and will be dumped over the gyratory crusher to be correctly sized. The newly extended roads can be seen either side of the train and in the distance can be seen are the railway workshops. 22nd May 2002.
|
|
3977 files on 199 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
77 |  |
 |
 |
 |
 |
 |
 |
|