Most viewed - Pilbara negative and digital Albums - Iron Ore |

110620 1959r294 viewsWalla Siding, BHP ore waggon 9070 loaded with Yandi fines, renumbered from 2821, originally built in 1971 by Comeng WA as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. 20th of June 2011.
|
|

225-05293 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie as it passes Goninan rebuild CM40-8M GE unit 5669. GeoData.
|
|

226-18293 viewsShaw North, 216.5 km, expanded view showing departure signals from left to right, SWN 4R repeater for SWN 4, SWN 4 for the mainline and SWN 6 for the loop, then SWN 6R on the far right. Loaded trains are about to descend the steep 1.5 percent decent to Garden Siding from this location. The interlocking room with solar array mounted above the cutting in the background with the arrival signal also visible. The repeaters are due to the 700 metre radius curve north bound trains round to approach this location. GeoData.
|
|

239-35293 viewsYandi Two, cab side shot of Goninan Dash 8 unit CM40-8M 5644 'Kangan' serial 8281-09/92-133, rebuilt from AE Goodwin built ALCo M636 5471 serial G6047-3 still with ALCo Hi-Ad bogies.
|
|

040805 095647293 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 734.
|
|

040806 091212293 viewsGoldsworthy Junction, weighbridge test waggon 507, originally built by Magor USA and ex Oroville Dam, converted by Mt Newman Mining into a 20 ton axle load test waggon.
|
|

050518 2081293 viewsFlash Butt yard, CFCLA hire ballast waggon CHQY type CHQY 745.
|
|

050704 3974293 viewsBing Siding, empty 116 kL Comeng NSW built tank waggon 0012 from 1972, one of three such tank waggons, view of A end and bogie detail.
|
|

060429 3729293 viewsFlash Butt yard, Pony re-laying waggon, built for Mt Newman Mining on the 24th September 1970 by Scotts of Ipswich, one of a batch of nine, one of a batch of nine in the series 6005-6013.
|
|

050412 0820293 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|

050421 1618293 viewsHesta Siding backtrack, Speno Australia's RR24 model 24 stone rail grinder serial M20 before they had id stickers fitted, this unit was later stickered as RG 1, rear view of the generator and driving module. 21st April 2005.
|
|

050421 1620293 viewsHesta Siding backtrack, Speno Australia's two 24 stone rail grinders coupled together before they had id stickers fitted, the left unit was later stickered as RG 2, the right unit was stickered as RG 1 and is serial M20. 21st April 2005.
|
|

150619 9089293 viewsFlash Butt yard, Speno owned and operated rail grinder RG2 for BHP, rail grinding module, from the left, water tank, electrical cabinet, blower fans and filter housing, water tank, water tank, electrical cabinet, blower fans and filter housing, fuel tank.
|
|

248-23293 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA C636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into C636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.
|
|

267-26293 viewsOn approach to the 39 km Detector Site the Sundowner Special runs along the Newman Mainline behind BHP Iron Ore's Goninan rebuild CM40-8M unit 5634 'Boodarie' serial number 8151-07 / 91-120 with sister 5653 on the rear. Friday 12th of April 2002.
|
|

283-34293 viewsNear Woodbrook as quad Robe River CM40-8M units 9414, 9420, 9410 and 9525 work a loaded 202 waggons bound for Cape Lambert as they pass through the cutting at the 37.5 km pipe bridge. 9420 which is a Goninan WA ALCo to GE rebuild CM40-8M with serial 8109-03 / 91-119 from March 1991 riding on Hi-Ad bogies and was originally an ALCo Schenectady built C630 serial 3486-4 and built new for Chesapeake & Ohio (USA) as their 2103. It is one of four C630 ALCo units purchased in 1974 and delivered to Robe in January 1975. Everything below the frame is ALCo while above is GE and Pilbara Cab. 22nd May 2002.
|
|

220-24292 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.
|
|

221-23292 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.
|
|

221-24292 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.
|
|

225-02292 viewsBing siding at the 17.5 km, Goninan rebuild CM40-8MEFI GE loco 5669 'Beilun' serial 8412-02 / 95-160 was the last Dash 8 built for BHP Iron Ore, seen here sitting at BNN 6 signal awaiting a path, note the CCTV camera mounted under the radiator wing as a trial for single man crewing when long end leading. GeoData.
|
|
6096 files on 305 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
80 |  |
 |
 |
 |
 |
 |
 |
|