Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Most viewed - Pilbara negative and digital Albums - Iron Ore
060501_3904.jpg
060501 3904108 viewsAbydos Siding backtrack, Speno rail grinder RG 2, possibly an RR24 model grinder with 24 grinding wheels view of generator module driving cab. 1st May 2006.
080621_2715.jpg
080621 2715108 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6101 in service with the rail recovery and transport train as waggon #7.
081217_0455.jpg
081217 0455108 viewsWoodstock Siding, rail recovery and transport train flat waggon #1, rear lead off waggon 6203, built by Comeng WA in January 1977 under order number 07-M-282 RY. The straddle crane is a newish unit built by Vaia Car model no. TCR-V and the four wheels are chain driven, replacing the original Gemco hydraulic unit.
100717_0661.jpg
100717 0661108 viewsFlash Butt yard, new rail stock carrier waggon 6027, built by Gemco Rail in late 2009-10 with Barber bogies.
100717_0671.jpg
100717 0671108 viewsFlash Butt yard, new rail stock carrier waggon 6025, built by Gemco Rail in late 2009-10 with Barber bogies.
150619_9082.jpg
150619 9082108 viewsFlash Butt yard, CNR-QRRS of China built side dump waggons, built and delivered around 2011-12, waggon 0710 loaded with fines for sheeting, mid-section detail.
150729_9455.jpg
150729 9455108 viewsBing Siding, empty 82 kL Comeng NSW built tank waggon 0003 one of six such tank waggons built in 1970-71.
160128_00333.jpg
160128 00333108 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0023, one of a batch of ten built in 2014.
160128_00337.jpg
160128 00337108 viewsMooka Siding, empty 116 kL CNR-QRRS of China built tank waggon 0041, one of a second batch delivered in 2015 with safety slogan 'Stay alert don't get hurt'.
170729_0172.jpg
170729 0172108 viewsFortescue River Bridge on the Robe River line at the 115.8 km, a loaded Deepdale train heading for Cape Lambert behind the standard motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 run over the largest rail bridge in the Pilbara. 29th July 2017. GeoData.
131122_3312.jpg
131122 3312108 viewsRio Tinto compressor waggon set CB 08, has been upgraded from the original Robe River compressor waggon set IC 22 with air receiver and IC 23 with two Atlas Copco XAS 97 units replacing the original Ingersoll Rand air compressors. These waggons are ballasted to 100 tonnes each and are modified ore waggons. Cape Lambert 22nd November 2013.
170510_8284.jpg
170510 8284108 viewsRio Tinto compressor waggon set CB 09, compressor control waggon with two diesel powered Kaeser M57 Utility air compressors. Note the waggons are modified ore waggon frames. Seen here at Cape Lambert. 10th May 2017.
080120_1469.jpg
080120 1469108 viewsThomas Yard, new FMG ore waggon pair 1263 slave and 2264 control waggons, 22.6 tonnes tare with rotary coupler, and the master at 22.9 tonnes. View from the handbrake end coupled to a GE Dash 9-44CW unit 011. 20th January 2008.
080304_2177.jpg
080304 2177108 viewsThomas Yard, down the rail welding end, side view of control waggon 2168, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 4th March 2008.
210510_1108.jpg
210510 1108108 viewsNear Gull on the Rio Tinto Dampier - Tom Price line at the 101.5 km, RTC type centre rail waggon RTC 012 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
210510_1150.jpg
210510 1150108 viewsNear Galah on the Rio Tinto Dampier - Tom Price line at the 89.5 km, RTS type straddle crane carrying rail waggon RTS 003 on Rio Tinto's Gemco Rail built rail train consist. 10th May 2021. Location.
220-26.jpg
220-26107 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
220-27.jpg
220-27107 viewsGoldsworthy Junction, an empty train on the Newman line approaches having departed Nelson Point. The line merging in from the right is the Goldsworthy line to Yarrie and Nimingarra, which can then be made out diverging to the left just after the interlocking room in front of the train.
221-31.jpg
221-31107 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.
221-36.jpg
221-36107 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.
3977 files on 199 page(s) 89

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional