Most viewed - Pilbara negative and digital Albums - Iron Ore |

269-15432 viewsBing North and the Alstom 25-year service agreement special led by BHP Iron Ore's Goninan GE rebuild CM40-8M unit 5653 'Chiba' serial number 8412-10 / 93-144 heads back to Nelson Point with The Sundowner and 5634 on the rear of the train. Friday 12th of April 2002.
|
|

283-13432 viewsHarding Siding on the Robe River line at the 42 kilometre post looking in the down direction towards Deepdale. Recently extended north end of the siding to accommodate the soon to be West Angelas traffic and longer trains. 22nd of May 2002.
|
|

283-23432 viewsHarding Siding, Robe River's Goninan GE rebuild CM40-8M unit 9414 serial number 8206-11 / 91-124 leads the typical quad power with 9420, 9410 and 9425 as they run along the loop road as part of the bedding down process. 9414 was rebuilt from AE Goodwin built M636 ALCo model with original serial number G-6060-5 from 1971. Wednesday 22nd May 2002.
|
|

9065 Comeng 110620 2356432 viewsWalla, loaded BHP ore waggon 9065, renumbered from original Comeng WA build waggon 2701 which was originally built in 1971 as part of a batch of four hundred waggons. The renumbering would be due to a new waggon replacing a potential scrap waggon, which then has been returned to service. June 20, 2011.
|
|

1560 Comeng 040912 152402432 viewsNelson Point, condemned Comeng WA built BHP ore waggon 1560, used here as a ground anchor on Stacker 4. Waggon 1560 was built in an order of two hundred and eighty-eight waggons in 1974. September 12, 2004.
|
|

224-21431 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073 as a loaded behind two CM40-8M units rolls through on the mainline. GeoData.
|
|

225-06431 viewsBing siding, the afternoon empty train to Yandi was a double AC6000, 112 waggons, AC6000 and 112 waggons for a long time, here's one on approach behind General Electric AC6000 6074 serial 51066 built by GE at Erie with sister unit 6075 as second unit before the locos were named. GeoData.
|
|

150523 8214431 viewsNelson Point Yard, BHP Billiton diesel fuel tank waggon 0034, view of B End, built in China by CNR - QRRS.
|
|

233-12431 viewsYandi Two exit portal or loaded car side of load-out tunnel, the Yandi Two load-out has two load-out stations or vaults to allow to different products to be loaded. Only one vault is used at a time. A loading train lead by BHP Iron Ore's Goninan rebuild CM40-8M GE unit 5650 'Yawata' serial 8412-07 / 93-141 as it drags the train through at 1.2 km/h. GeoData.
|
|

238-09431 viewsPort Hedland Harbour, heavy lift ship Happy Buccaneer (IMO: 8300389) sits at Finucane Island D Berth delivering a new shiploader for BHP Billiton. 1st November 2003. Geodata . Back in time here the ship cranes were only 550 tonne each, these are now 700.
|
|

238-16431 viewsNelson Point, ex Southern Pacific tunnel motor locomotive 8335 an EMD SD40T-2 unit, serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, purchased as a spare parts source for the other SD40 style units BHP Billiton purchased in 2003/04. 19th November 2003. Geodata .
|
|

239-33431 viewsYandi Two, train loading is under way with a pair of Goninan rebuild units, CM40-8MEFI unit 5668 'Dunkirk' serial 8412-01/95-159 and CM40-8M unit 5644 'Kangan' serial 8281-09/92-133. The lead unit was originally Comeng NSW built ALCo M636 5489 serial C6084-5, while second unit 5644 was originally a AE Goodwin built ALCo M636 5471 serial G6047-3.
|
|

Sundowner EG Budd USA 040912 142134431 viewsNelson Point, Silver Star observation coach, 'Sundowner', 3/4 view from rear end. Originally built by E. G. Budd in 1939 numbered 301 as the Silver Star as a diner-parlour-observation coach on the Chicago, Burlington and Quincy Railroad's General Pershing Zephyr train from the 1930s and 1940s. Donated to Mt Newman Mining Co. by AMAX an original joint venture partner to commemorate the projects first 100 million tonnes of iron ore railed between Mount Whaleback mine and the Port Hedland port.
|
|

0018 Comeng WA 050410 0536431 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.
|
|

0534 Magor USA 050412 0755431 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA waggon 534, originally in ore service before conversion to a ballast waggon.
|
|

0515 Magor USA 050412 0763431 viewsQuarry 8, Shaw Siding area. 3/4 view of 1963 built Magor USA ballast waggon 515.
|
|

CHRY 759 050518 2107431 viewsFlash Butt yard, CFCLA hire ballast waggon CHRY type CHRY 759.
|
|

050724 4237431 viewsNelson Point yard, flat waggons in service on the Pony re-laying train as transport waggons for sleepers, with a gantry car delivering concrete sleepers to replace the removed steel sleepers. The left waggon is an ex Goldsworthy Mining flat waggon with a Scotts of Ipswich built flat waggon with the gantry car on it, built in 1970 for then Mt Newman Mining Company.
|
|

Pony Harsco 060429 3766431 viewsFlash Butt yard, view of Harsco 'Pony' track resleeping and relaying machine. Originally owned by Barclay Mowlem.
|
|

050412 0820431 viewsAbydos Siding backtrack, front view of BHP's Mainline Tamper 1, a Plasser Australia 09-32 CAT model tamper serial 306 built in 1986. 12th April 2005.
|
|
| 6220 files on 311 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
94 |  |
 |
 |
 |
 |
 |
 |
|